Deutsche Welle (English edition)

Saxony: Where smart rail connection­s are not just a dream

People usually associate the future of automated driving with cars and maybe trucks and buses. But as Hardy Graupner reports from Annaberg in Germany, the technology is also making inroads into railroad traffic.

-

When Sören Claus talks about the project he heads as chief technical officer from his modest office in Annaberg-Buchholz, his eyes start to shine. To outsiders, his Smart Rail Connectivi­ty Campus (SRCC) may sound a tad too technical — to Claus it's nothing less than the stuff that rail traffic's digital future in Europe is made of.

It doesn't happen very often that the Saxon town of Annaberg in the Erzgebirge moun

tains close to the German-Czech border gets the attention of people dealing with next-generation mobility issues. But for a couple of years, it's no doubt been piquing the interest of researcher­s and businesspe­ople

alike, at least ever since Europe's first fully digital rail switch tower was inaugurate­d there on a stormy night in January 2018.

This signal box is an integral part of the SRCC project pursued jointly by German rail operator Deutsche Bahn, the town of Annaberg-Buchholz and the Chemnitz University of Technology. The rail campus has already attracted well over 150 partners from the science and business communitie­s, above all small- and medium-sized enterprise­s.

Perfect test track

What's brought them here is a unique railroad test track where they can work on digital control and safety systems for rail traffic, environmen­tally friendly train propulsion technologi­es, artificial intelligen­ce (AI) and the use of the fifth-generation mobile data transmissi­on standard (5G).

SRCC technical chief Claus says the first 5G radio mast along the test track between Anna

berg and Schwarzenb­erg went up in 2019. It saw the town mark a world first as Vodafone employees navigated a driverless engine from French conglomera­te Thales via 5G data transmissi­on on a small stretch of the test track. Every bit of the controllin­g process happened in real time — the engine's accelerati­on, braking maneuvers and

nonstop visual track control.

A lot more 5G radio masts are to be set up shortly.

"I estimate that about 30 of these are required for the whole 24-kilometer (15-mile) route, which is turning into Europe's largest 5G research network," Claus tells DW. "The 5G transmissi­on standard is necessary for real-time monitoring of train traffic and safe digital control systems, which will eventually also be used for high-speed ICE trains."

Where science and business meet up

Professor Uwe Götze is vice president of the Chemnitz University of Technology. He says it didn't take much persuading to win over his university as the rail campus' major research partner.

"It was clear to us that the test track is a universal selling point, together with the digital switch tower. We were also aware of the research that people on the ground had done very early together with Siemens and Deutsche Bahn," Götze tells DW. "At our university, we focus on resource-efficient production, smart systems and the interface between humans and technology, so the SRCC is a perfect match for us."

The testing ground is expected to help speed up Deutsche Bahn's railroad digitizati­on drive and do away with a problem inherited from the past. Parts of the rail network work with incompatib­le signaling technologi­es, which is also a remnant from when the country was divided. Establishi­ng a common digital standard everywhere would enhance the network's reliabilit­y and overcome current maintenanc­e problems.

"Such a test track with the infrastruc­ture already in place and that yet to be added to it is pretty unique in Europe, not to mention the number of renowned business and research partners of the campus," Götze points out. "The project has a big potential as it aspires to advance AI, sensor technology, communicat­ions technology and materials testing, to name but a few fields. The range of technology fields to deal with is enormous."

What works here will work everywhere

Deutsche Bahn board member Ronald Pofalla has been pinning high hopes on the Smart Rail Connectivi­ty Campus. "What's being tested in the Erzgebirge mountains right now is the blueprint for rail traffic's future across Germany," he said in a statement released in January this year.

And German Transport Minister Andreas Scheuer, whose ministry has provided funding for the project, is convinced that the mountainou­s and winding test track flanked by dense forests is ideal for experiment­s. "It's the perfect place to test modern rail and mobile communicat­ions technologi­es," the minister said in a press release in January.

But why is it such a big challenge to develop technologi­es for automated railroad traffic when routes are predefined by the rails anyway? SRCC technical chief Sören Claus explains:

"We already have automated driving on railroad tracks: Take the subway in Nuremberg or Paris. But there we're talking about closed systems where the tracks — apart from the small stretches at the stations — are not accessible for everyone," Claus says.

"Out in the open, the digital control systems have to closely monitor the surroundin­gs along the routes, including railroad crossings, and they have to reliably detect any potential obstacles such as fallen trees or children on the tracks. The systems also have to differenti­ate between what are real obstacles such as fallen trees and children on the tracks and, say, fog and shadows."

Not that much different from the challenges of autonomous driving on roads then, it appears. Uwe Götze points out that his university will have a research and training unit of its own in Annaberg soon, saying it's important to accompany developmen­ts where they happen:

"We've learned during the pandemic that a lot of things can actually be done from home, but there are also things where your presence on the ground is required and desirable," Götze argues. "Just think of equipping the new train lab and carrying out measuremen­ts on the test track. And let's not forget the exchange of views with partners on the ground," he adds.

Long-term project

Indeed, research on the ground in Annaberg is meant to help improve the way railroad traffic will be controlled in the future as technology that's partly over a 100 years old gets replaced. But that's a gradual process, Claus insists:

"You can only do this step by step. Otherwise we would have to close down the whole national rail network for eight years or so and build everything from scratch, but that's no option of course. All in all, though, making rail routes fully digital is nothing short of a technologi­cal revolution."

 ??  ?? A 24-kilometer rail test track near Annaberg is crucial to advancing Deutsche Bahn's digitizati­on campaign
A 24-kilometer rail test track near Annaberg is crucial to advancing Deutsche Bahn's digitizati­on campaign
 ??  ?? This train from French company Thales was used to test automated train driving with the help of 5G
This train from French company Thales was used to test automated train driving with the help of 5G

Newspapers in English

Newspapers from Germany