WHIZZING AWAY
These massive machines will each stand 300 meters tall with 200-metre rotor spans that will stretch the length of two football fields. The answer (to no The wind power sector subsidies), according is at a critical juncture to the companies, are as politicians enact a the megaturbines, long-planned push to which would sweep a make the industry more far bigger area and commercially viable harness more wind, and able to compete cutting costs per with other energy megawatt. sources