Hindustan Times ST (Jaipur)

Govt to clear $2 billion deal for Israeli-made warning systems

- Shishir Gupta letters@hindustant­imes.com

THE PHALCON RADAR IS GOING TO COST ABOUT $1 BILLION WITH ANOTHER $1 BILLION GOING TOWARDS THE PURCHASE OF THE PLATFORM, IN THIS CASE RUSSIAN A-50 AIRCRAFT

NEWDELHI: Spurred by the standoff with People’s Liberation Army in Ladakh, the Narendra Modi government is all set to clear acquisitio­n of two PHALCON airborne warning and control systems (AWACS) as early as next week.

India has three PHALCON AWACS with a 360 degree rotodome mounted on top of the airc r a f t a nd t wo DRDO- bui l t AWACS with 240 degree rotodome. China has 28 AWACS and Pakistan has seven for directing the air battle in the worst case scenario.

While the government is tight-lipped about the entire process, the acquisitio­n was given a final official go last week and has been put up before the Cabinet Committee on Security (CCS). This is the second time it has reached the CCS. The last time, the CCS sent the proposal back t o National Securit y Adviser Ajit Doval and sought some clarificat­ions.

The PHALCON radar is going to cost about $1 billion with another $1 billion going towards the purchase of the platform, in this case Russian A-50 aircraft. The radar and the platform will be integrated in Israel. It will take about two to three years for the delivery of the complete system.

The need for more AWACS was first felt during the Pakistani aerial dogfight after the February 26 Balakot strike by the Indian Air Force.

While Pakistan was flying two Swedish made AWACS round the clock to detect and repel any intrusion into its air space, the IAF was, at times vulnerable due to the limitation of its resources.

The requiremen­t for more AWACS or eyes in the sky were felt after the PLA unilateral aggression in East Ladakh and their reluctance to restore status quo ante even after the Special Representa­tives on both sides agreed to both dis-engagement and de-escalation.

Apart from this the Modi government has decided to push road connectivi­ty towards the Daulat Beg Oldie sector with the Border Roads Organizati­on asking permission of the Ministry of Home Affairs to cut a road over the glaciated Saser La to link up DBO with Sansoma via Murgo as an alternativ­e to the Darbuk-shyok-dbo road.

The BRO has already built the road from Murgo to Saser Brangsa, which si t s on t he mouth of the Saser La.

Even though Saser La is a glaciated moraine, the BRO has the ability to build a road over it for the present and a tunnel under the permafrost in the future.

Once the road is built, it will allow Indian Army to rapidly move troops from the Siachen sector into Sub-sector North depending on the requiremen­t. Sansoma, on the banks of Nubra River is an important logistics base for the Siachen Glacier troop deployment­s.

Apart from the high-value AWACS, the Indian Army is al so acquiring 200 t actical drones for its battalion commanders so that the immediate battle theatre is transparen­t. This drones has been developed locally in collaborat­ion with the DRDO and has undergone trials.

Newspapers in English

Newspapers from India