THE ‘SPINES’ OF THE PROPOSED NEW DUBLIN BUS NETWORK
Services on these routes would operate every five to eight minutes. The routes would divide into branches in suburban areas beyond the end of the spines (e.g. A1, A2, A3), with no bus interchange required. Services on most of these branches would operate every 15 minutes or better, with higher frequencies at peak times.