Arab Times

Documents ready for signature of concerned body PART obtains SAB nod for 3rd phase of Al-Ghous St project

-

KUWAIT CITY, Jan 19: The Public Authority for Roads and Transporta­tion (PART) has obtained approval from the State Audit Bureau (SAB) for the third phase of Al-Ghous Street project number H/265 – constructi­on and maintenanc­e works along this street starting from the Seventh Ring Road to Fahaheel-Ahmadi Road 212, reports AlAnba daily quoting reliable sources.

Sources disclosed the contracts and documents related to project supervisio­n are now ready for the signature

Al-Kandari stressed that EPA’s air quality monitoring stations do not, in all of the concerned authority, while the preparatio­n of documents related to the contract for the abovementi­oned project is underway.

Sources said the project is aimed at improving Al-Ghous Street to ensure smooth flow of traffic. Sources revealed the project includes developmen­t of intersecti­ons with 12 flyovers, increasing the safety level through the provision of service roads for residentia­l areas, 11 new pedestrian bridges, widening the lanes – up to the standard

cases, record increases in pollutants because of the direction of the wind, which width of 3.70 meters, and renovating bus stops.

Sources also unveiled a plan to add another lane as part of the project if the need arises, explaining that Al-Ghous Street is an arterial road with a total length of 30 kilometers and is located between Roads 30 and 40 extending from the Fifth Ring Road to the Fahaheel-Ahmadi Highway and intersecti­ng with the Fifth, Sixth and Seventh Ring Roads which serve motorists from adjacent residentia­l areas.

carries what comes out of the chimneys of energy production plants to uninhabite­d

places, adding that emissions diminish and dissolve in the air over time.

Newspapers in English

Newspapers from Kuwait