The Borneo Post (Sabah)

Project to convert waste into energy in Semporna

- By Chok Sim Yee

KOTA KINABALU: Sabahbased Syonku Group Sdn Bhd yesterday inked a Memorandum of Understand­ing (MoU) with Hira Energy Sdn Bhd to collaborat­e in building a pilot facility project that converts waste to energy and biofuels in Semporna.

Syonku Group director Hasai bin Tudai believed that the project would be the first-of-its-kind in Malaysia and the third in Asia, after Thailand and Indonesia.

Constructi­on of the plant is targeted to start early next year with an estimated cost of about USD15 million.

“The facility enables solid waste, except for rocks, to be processed into biofuel and energy,” he said at the signing ceremony here yesterday.

The ceremony was witnessed by Assistant Minister of Trade and Industries Azhar Bin Datuk Matussin.

Establishe­d in 2015, Syonku Group is a Petronas licensed vendor which involves in oil and gas projects, engineerin­g and unmanned aerial vehicle (UAV), or drones.

Meanwhile, Hira Energy, a company based in West Malaysia, is the patent holder of the American technology to convert waste to energy and biofuels.

Hasai said Semporna was chosen as the location for the pilot project because it was a tourist attraction, adding that the initiative would also create job opportunit­ies.

He said the company would liaise with Sabah Electricit­y Sdn Bhd (SESB) to sell the energy generated from the facility to the latter.

He also hoped that the State Government would support this project.

On the other hand, Hira Energy regional representa­tive for Asia and Oceania, Muhammad Yani AS said the pilot project was planned in Semporna because it was a resort island and tourism destinatio­n.

He said the project would focus on turning waste from hotels, resorts and beaches into energy and biofuel.

Muhammad added that the success of the project could potentiall­y boost eco-tourism in Semporna.

He said the first phase of constructi­on of the facility was targeted to commence in early January next year.

“We will start by converting 200 to 300 tonnes of rubbish per day, which can generate a minimum of 5 to 6 MW in a simple cycle system, and up to a maximum of 10 MW,” he added.

Also present was Hira Energy chief executive officer Musaluddin Muhammad Yusof.

 ??  ?? Azhar (second right) witnesses the exchange of MOU documents between Hasai (right) and Musaluddin (second left) while Muhammad looks on.
Azhar (second right) witnesses the exchange of MOU documents between Hasai (right) and Musaluddin (second left) while Muhammad looks on.

Newspapers in English

Newspapers from Malaysia