The Borneo Post

Govt funds replacemen­t tanks at Block 10, RPR Tondong

- By Rintos Mail reporters@theborneop­ost.com

KUCHING: The sewerage problem faced by occupants of Block 10, RPR Tondong in Batu Kawa here will be resolved within the next three months.

Sarawak Housing Developmen­t Commission ( SHDC) chief executive officer Asman Ahmad said works to replace the septic tanks of Block 10 worth RM261,549 would begin anytime now.

He said the problem of the three septic tanks at Block 10 was first detected about two years ago and SHDC through the Ministry of Local Government and Housing had applied for fund from the previous federal government.

He said the fund was approved early this year but was scrapped following a change in government.

“However, the Minister of Local Government and Housing Datuk Dr Sim Kui Hian wanted the problem to be resolved and SHDC has come up with this fund to replace the septic tanks here.

“So this project is fully funded by Sarawak government through SHDC according to the proper procedure,” he said at the handing over of acceptance letter to the contractor for the proposed replacemen­t of three septic tanks at Block 10 here yesterday.

He said the project was awarded to Zul Constructi­on Company as a result of open tender.

Asman hoped for patience and cooperatio­n from the residents during the replacemen­t works.

“There are bound to be some inconvenie­nce during the course of work, and hopefully everyone can bear with us and the contractor,” he said.

Political secretary to the Chief Minister Tan Kai, who represente­d Dr Sim, witnessed the handing over of acceptance letter to the appointed contractor.

 ??  ?? Asman (left) hands over the acceptance letter to a representa­tive of Zul Constructi­on Company witnessed by Tan Kai (second left).
Asman (left) hands over the acceptance letter to a representa­tive of Zul Constructi­on Company witnessed by Tan Kai (second left).

Newspapers in English

Newspapers from Malaysia