The New Zealand Herald

Our troubled bridge over harbour water

-

The damage to Auckland’s Harbour Bridge once again exposes the underlying problems holding our biggest city back. Yesterday Auckland commuters again suffered long delays as the New Zealand Transport Agency worked to repair a strut on the bridge after truck crashes closed four lanes on Friday.

A crash on the North Shore tripled travel times for some commuters yesterday morning due to bridge lane closures. Both the bridge and western routes were busy and a ferry breakdown added to the frustratio­n.

Permanent repairs will take weeks after two trucks were blown over by winds gusting up to 127km/h, damaging the bridge’s superstruc­ture.

The latest transport issues, after months of drought and previous problems with the power grid, point to Auckland’s infrastruc­ture not being robust enough. There’s a fine line between being a functional city and failing under extreme events but both foreseeabl­e hurdles and potential surprises should be planned for.

Auckland has rarely been a poster child for great planning and striking vision. Projects take years to come to fruition if at all, and clear opportunit­ies are frequently missed.

For every success, such as the Viaduct, the Waterview Tunnel and the western cycleway into the centre, there are failures. They include the ongoing sore spot of a rail link from the airport; a lack of pedestrian­isation and beautifica­tion of Queen St; the inability to construct a bold sports stadium on the waterfront when there was a tailormade chance with the hosting of the Rugby World Cup; the inability to secure the city’s ongoing water supply as climate change becomes more apparent.

The one bright side shining on our bridge over troubled water is that the pandemic has already establishe­d the capacity for many office workers to operate remotely, and reduce traffic flows. NZTA said North Shore residents who work in the city — and are able to — should strongly consider working from home. Those who didn’t heed that advice will have more incentive today.

As with the pandemic, it further illustrate­s the need for longer-term changes to the city with more transport and housing options, less traffic in the centre, and greater use of remote working.

The goal should be to disperse traffic flows and reduce emissions, and that can be done in a variety of ways: new roadway and rail alternativ­es; more buses, lanes and park-and-ride options; more safe walking and cycling routes, more water traffic.

Major urban authoritie­s overseas have used the pandemic for planning moves to better position their cities to face the future, while making use of coronaviru­s recovery money. Here, various authoritie­s have reacted by tending to reach for what they know has worked in the past rather than thinking through what would work for now and in the future.

The Super City was supposed to bring clarity of focus to the major infrastruc­ture requiremen­ts of the region. Ten years on, we are reminded of the opportunit­ies missed.

This newspaper is subject to NZ Media Council procedures. A complaint must first be directed in writing, within one month of publicatio­n, to formalcomp­laints@nzherald.co.nz. If dissatisfi­ed, the complaint may be sent to the Media Council, P O Box 10-879, The Terrace, Wellington 6143. Or use the online complaint form at www.mediacounc­il.org.nz Include copies of the article and all correspond­ence with the publicatio­n.

 ??  ??

Newspapers in English

Newspapers from New Zealand