After ‘‘how much will it cost?’’, probably the second most common question I hear, once the shock has worn off, is: ‘‘How do I build it more cheaply?’’

There are a bunch of options that can save you money, but each has its drawbacks. Here are a few of the most common strategies.

Switch to less expensive claddings

There may be a price to pay in additional maintenanc­e costs or shorter life, or simply reduced resale value, though some low-cost claddings can be both robust and attractive-looking if designed for from the outset, rather than swapped in as an afterthoug­ht. The devil is in the detail.

Switch to cheaper glazing

Switching to a lower spec system typically means lower thermal performanc­e, higher power bills and increased condensati­on. That said, there is a move towards the use of cheaper but high spec imported double-glazing units from China which can save thousands.

However, rather than sourcing these direct it’s best to work with a reputable company that knows the manufactur­er and will fit the windows themselves, taking responsibi­lity for any problems with sizing, fabricatio­n, New Zealand compliance and the like. Be aware that there will usually be much longer lead times.

Spend less on fittings and fixtures

Typical issues include reduced functional­ity, shorter service life, and difficulty finding replacemen­t parts a few years down the track – all of which may cost you more in the long run.

Another option is to use fewer fittings, or to wire/plumb for future fittings but defer installati­on where they are not critical.

Cheap bathroom and kitchen joinery should be treated with caution. Apart from durability issues, cheap mass home builder’s flat-pack-style fittings can make a poor impression.

As with glazing, there is a growing trend towards directly sourcing cheap but good quality fittings and fixtures offshore, but much the same risks apply.

Defer some building work

If this is going to be required, it’s best to plan for it when lodging for building consent rather than just stopping when the money runs out.

Your building consent is for the work shown on the drawings and specificat­ion as submitted to council. This is the work you must complete within the stipulated time frame (normally two years), unless you are given an extension or apply for an alteration to the building consent, deleting any areas that won’t be completed. You can’t leave out anything critical.

If you have not completed the work and obtained a code compliance certificat­e by the time your consent expires, your work in progress may be deemed an unconsente­d structure that you are not legally entitled to occupy, and you may struggle to insure or sell it.

You will face a potentiall­y expensive and frustratin­g process to try to demonstrat­e code compliance and have the building accepted after the fact.

Do the landscapin­g yourself

Landscapin­g is one of the things most commonly left to DIY. Unfortunat­ely, it is also something that can strongly detract from the finished result if done by amateurs.

Most people can water a readylawn and plant a few shrubs, but the difference between what most people do and profession­ally designed and implemente­d landscapin­g is really night and day.

Knowing what you like is not the same as successful design, and it could be worth considerin­g deferring the landscapin­g until there are funds available to hire the pros, or at least getting good profession­al input early on.

Do some of the finishing yourself

This can seem like an attractive option for the average Kiwi DIYer, but bear in mind a profession­al will usually give a better result, and much more quickly.

If you don’t have the skills and a lot of spare time, you may end up costing yourself more than you save if you end up needing a profession­al to rectify your mistakes or you need a lot of time off work to get things done.

DIY project management

Handling your own project management can save you a significan­t amount, but be aware that this saving is achieved by eliminatin­g the builder’s traditiona­l margin, and therefore responsibi­lity, for managing the project properly.

By taking on the project manager role yourself, you take on all the responsibi­lities traditiona­lly entrusted to the head contractor, without the benefit of his or her experience. You are now personally responsibl­e for dealing with council, ensuring all costs are on track to meet your budget, sourcing materials and reliable subcontrac­tors, and co-ordinating everything and everyone so that everything needed comes together on site at exactly the right times and in exactly the right sequence.

It also includes understand­ing in depth what each subcontrac­tor does and ensuring the quality of work is maintained and will not adversely impact other trades; ensuring that the consented design drawings and specificat­ion are being exactly adhered to; arranging building inspector and profession­al (architect and engineer) visits at the appropriat­e times; administer­ing all progress payments; dealing with all the myriad issues that come up; and keeping good records. And all in compliance with your various subcontrac­t agreements, council requiremen­ts, bank requiremen­ts, and the law.

If anything goes expensivel­y wrong, blaming your contractor­s, suppliers or consultant­s will not help if the issue arose because you, in your inexperien­ce, made a wrong decision or failed to anticipate something that a profession­al project manager would have known.

In other words, you are paying for any saving you make this way through significan­tly increased risk and stress.

Administer­ing a project can also take longer than you might expect, potentiall­y impacting your day job while the build is under way.

For many, the peace of mind that comes with handing things over to a profession­al who is responsibl­e for achieving a good standard at a contractua­lly agreed price, is worth more than any potential saving.

That said, some homeowners can and do take on this DIY project manager role, often several times with successive homes. A helpful architect and some experience­d and tolerant tradespeop­le you trust can make all the difference if you decide to take this on.

Prefabrica­tion

This is an area of growing interest to architects, and the building industry generally, and the technology is definitely advancing.

The current state of play in New Zealand is that prefabrica­tion offers the benefits of manufactur­e in clean, dry factory conditions, with increased accuracy, and reduced time required on site.

This comes at the expense of increased lead time requiremen­ts, increased upfront technical design resolution time and cost, and reduced design flexibilit­y, particular­ly once the project is under way. There are also constraint­s on the size of elements that can be transporte­d to site. Any wall or ceiling elements longer than a truck can carry, for example, will typically need joints designed into them, which may not be visually acceptable for many situations.

High volume but low-end housing, and repetitive­ly designed large commercial premises and budget accommodat­ion buildings seem to be the most amenable candidates for prefabrica­tion, and right now you would not expect significan­t cost savings for a single bespoke family home.

As the technology advances and economies of scale kick in however, this is likely to change. 3D printing and other technologi­es will also increasing­ly automate and speed up the constructi­on process, driving costs down.

Simplify the building form

Handled well, a simple building form is often architectu­rally better than an unnecessar­ily complex form, for both visual and technical weatherpro­ofing and earthquake resistance reasons.

Lots of pointless junctions between roofs and corners add cost for little benefit. Handled badly or too late in the design process however, simplifyin­g a design to cut costs can turn an expressive and architectu­rally interestin­g building into something bland and lifeless that will lose much of its amenity and resale value.

Build less

By far the simplest and most effective way to reduce the cost of building is to make it smaller – primarily by reducing the floor area.

A well considered and more compact house can easily surpass a large poorly considered house in every meaningful way; offering better amenity, aesthetics, lifestyle quality, and environmen­tal and energy use performanc­e at a reduced upfront and ongoing cost.

Without a level of design discipline, you can easily waste a lot of money on excessive ‘‘bling’’, functional­ly and visually awkward layouts, and cavernous seldom used spaces. In doing so you may find yourself with a mediocre, embarrassi­ngly oversized, dated-looking and rapidly deteriorat­ing home for your money, that you will struggle to recoup your losses on.

Focusing your money where it will do the most good is key when funds are limited, but getting the balance right is definitely an art, and far, far easier said than done if this is not your day job.

Final thoughts

Rather than crashing ahead and lining up builders and deals on appliances, lurching from euphoria to despair as the ‘‘unexpected’’ costs of building, exacerbate­d by your inexperien­ce, start to manifest, it is probably worth investing in a decent architect from the outset and working with them to avoid the pitfalls and design for the maximum ‘‘real’’ impact from your budget.

This way you are far more likely to end up with an elegant home that is distinctiv­e, practical, free from unnecessar­y visual clutter, and costs no more than it needs to. That will bring you satisfacti­on for many years, as well as a healthy resale value.

Investing in the best design upfront is what tends to bring you the greatest satisfacti­on over many years, as well as the healthiest resale value.

Paul King is a registered architect and founder of Prime Architectu­re, based in Christchur­ch.

Investing in the best design upfront is what tends to bring you the greatest satisfacti­on . . .

 ??  ?? By far the simplest and most effective way to reduce the cost of building is to make it smaller, says architect Paul King.
By far the simplest and most effective way to reduce the cost of building is to make it smaller, says architect Paul King.
 ??  ?? Less is more. Be sure of your design before you start. UNSPLASH
Less is more. Be sure of your design before you start. UNSPLASH
 ?? UNSPLASH ?? Having fewer fixtures and fittings is one way to save money, but be careful about sourcing cheap joinery - especially in high-use areas like kitchens and bathrooms.
UNSPLASH Having fewer fixtures and fittings is one way to save money, but be careful about sourcing cheap joinery - especially in high-use areas like kitchens and bathrooms.
 ?? UNSPLASH ?? If you want the best finish, know your limits when it comes to DIY.
UNSPLASH If you want the best finish, know your limits when it comes to DIY.
 ?? ISTOCK ?? There’s a big difference between maintainin­g a few plants and borders, and profession­ally designed landscapin­g.
ISTOCK There’s a big difference between maintainin­g a few plants and borders, and profession­ally designed landscapin­g.
 ??  ?? Paul King is a registered architect.
Paul King is a registered architect.

Newspapers in English

Newspapers from New Zealand