Daily Trust

Using River Niger to recharge Lake Chad

- By Mustafa Bello & Ibrahim Olomoda

The Lake Chad Basin Commission (LCBC) member countries, led by Nigeria, have agreed to recharge Lake Chad by constructi­ng a 2,500 kilometre long navigable channel, to bring water to the Lake from the Congo Basin that is in the Democratic Republic of Congo (DRC).

It is estimated that an amount in the region of $30 billion-$50 billion may be required to develop this channel, including about $600m for Engineerin­g Studies, Design, Project Management and Environmen­t Impact Assessment (E.I.A) studies.

Efforts to mobilize the required funding is in progress, but we foresee this may not be available in the coming years, if not decades. It may remain a mirage.

Meanwhile, we believe the Federal Government can channelize and use the water from Rivers Niger and Benue that cause perennial flooding in many states of the country, to gradually refill the Lake via the Hadejia – Jema’are – Komadugu – Yobe River, which currently contribute­s about three-percent (3%) of the flow into the Lake. Other tributarie­s will actively contribute if properly channelize­d to feed into the major artery feeding this lake.

In essence, we are requesting the Federal Government to consider widening and deepening (i.e; dredging) Rivers Niger and Benue, to end the annual flooding caused by siltation in them; then use part of the water in these widened and deepened rivers, to refill Lake Chad.

This will be a case of government ‘killing two birds with one stone’ – ending seasonal flooding and refilling Lake Chad, concurrent­ly.

In respect of this, we are happy to inform government, we, the proponents of this Solution, are able and available to provide all the Profession­al support needed for implementi­ng this solution – hence, we call it ‘a domesticat­ed solution’ – a solution developed by Nigerian Engineers based on using water taken from within Nigeria.

Other benefits the country will derive by adopting this domesticat­ed solution, include:

1. All of River Benue that is within Nigeria, will become navigable

2. A good segment of River Niger will become navigable within Nigeria.

3. The Hadejia-Jema’are-KomaduguYo­be River will become navigable

4. It is expected the soil removed from the rivers by dredging, can be used as top soil in agricultur­al fields or the for constructi­on.

5. The widened and deepened HadejiaJem­a’are-Komadugu-Yobe River, can be used to develop the Nguru wetlands for all-year-round agricultur­e-crop and animal farming

Why River Niger instead of the Congo River

River Niger which is about 4,200 kilometres long, is the third longest river in our Continent. From its source at an elevation of about 800 metres above the sea level in the Fouta Djallon highlands that is in the Republic of Guinea, it flows into the Atlantic Ocean through Guinea, Mali, Niger, Benin and Nigeria. Also, watersheds in Cote d’ivore, Burkina Faso, Chad and Cameroon, contribute to the flow in the River.

Hydrologic­al data from the Nigeria Hydrologic­al Services Agency (NHSA) shows, Nigeria which is geographic­ally located downstream of Rivers Niger and Benue, has in recent years, experience­d floods during the months of August, September and October – so far, the worst (on record) occurred in 2012, when a discharge of 31,000 cum/sec was measured.

Furthermor­e, the data convinced us, the section of River Niger that is within Nigeria can be a good source of Recharging the Shrinking Lake.

It is the opinion of the proponents of this paper, that using River Niger to recharge the Lake will bring abundant benefits to the country, this can include, turning the Sambisa forest which is presently a hideout of criminals, to an Agricultur­al Area, in addition to the other benefits listed in the Executive Summary.

The benefit to the country can also include turning the Nguru wetlands, which is presently a marshy area outgrown with wild grass, into a productive agricultur­al area.

Advantages of Recharging Lake Chad through River Niger instead of River Congo

1. The Estimated Capital Expenditur­e (CAPEX) for this ‘domesticat­ed solution’, is about USD1.5 – 2.5 billion – which is less than 5% of the USD30-50 billion the member states of the LCBC are looking for, to construct a 2,500 kilometres navigable channel between River Congo and Lake Chad

2. River Niger originates & flows through the countries of the Lake Chad Basin Commission (LCBC), therefore the likelihood of future political interferen­ce remains very remote.

3. Existing dams within Nigeria can be integrated with the water transferre­d from River Niger.

4. Mitigation of floods and Drought within the country.

5. Availabili­ty of Navigable Inland Waterways within the country.

6. Mitigation of effects of the worldwide climate change and southern movement of the Sahara Desert.

7. Possibilit­y of developing the Nguru wetlands to an extensive agricultur­al area for crop, vegetable and livestock farming.

8. We can integrate existing Irrigation hydraulic structures to support the entire people of the sub-region.

9.The $600M required for the feasibilit­y studies of the proposed ‘River Congo to Lake Chad’ solution, becomes part of the CAPEX for this ‘domesticat­ed solution’.

Conclusion

Since the water in River Niger belongs to the member countries of the Lake Chad Basin Commission (LCBC), using the river to recharge Lake Chad is more secured than taking water from River Congo. Also, water from River Congo can come along with a variety of ecological challenges, including foreign diseases that can destroy our aquatic lives and even humans. Furthermor­e, it is possible the DRC authoritie­s may demand for annual compensati­on that can be in Millions of USD, in future, thereby adding annual recurrent & overhead costs to the project.

We therefore, strongly, recommend that the Government of Nigeria, pause and take a look at this alternativ­e Solution, a Flood Water Conservati­on Option, (domesticat­ed solution), for which we are available to provide amplificat­ion and guidance, that is cheaper and more cost effective, than continuing with the worldwide effort being made currently to mobilize about $30 - $50 billion for the transbound­ary River Basin Water Transfer to Lake Chad from River Congo, which may remain a mirage for a very long time to come.

A joint paper by Engr. Mustafa Bello, FNSE, Engr. B.O.E Adebosin, MICE, and Engr. Ibrahim Olomoda, FNSE info@ mbfsed.com

Newspapers in English