Edo Commences Reconstruction of Lucky Way
Residents at Lucky Way in Benin City, the Edo State capital, can now heave a sigh of relief due to the ongoing rehabilitation work to reconstruct their roads by state governor, Mr. Godwin Obaseki.
The link road, connecting Ramat Park to Upper Mission, had been in horrendous shape for years and had caused severe heartache, with several motorists and residents noting that the road could not get any worse.
The stretch of the road is three kilometres from the Ramat Park end to Upper Mission, the terminal point of the job. A new side drain will be done and be channelled underground to the drainage located at Auchi-Benin Road. A deep manhole of about 12 meters depth will be constructed to take the entire water to Ikpoba dam.
Describing the ongoing rehabilitation as long-awaited, Madam Peace Paulinus, whose tailoring shop was along Lucky way, said the road was in such a condition that rains rendered it virtually unmotorable, according a release by the Chief Press Secretary (Interim) to the Governor, Mr. John Mayaki.
“The absence of tricycles is a big challenge to all because it makes it difficult to get to your destination. I was the happiest person when l noticed that government had deployed contractors to Lucky Way Road to rehabilitate the road. I will be glad if the road is rehabilitated.”
For his part, Benedict Okeke, a tricycle rider plying lucky way lamented the road’s condition, saying: “We take our tricycles for repairs on daily basis because of the dilapidated state of the road. Most importantly, we the riders left no longer find passengers to carry. The road is a death trap to motorists and tricycle riders.”