THISDAY

PNG Achieves One Million Man-hours LTI-free Operation

- Ejiofor Alike

PNG Gas Limited, a subsidiary of Gas Train Limited, has stated that it has achieved operationa­l safety of one million man-hours without lost-time incident (LTI) at its Egbaoma Gas Processing Plant located at Ebedei, Ukwani Local Government Area of Delta State.

Lost Time Incident or Injury (LTI) is a measure of injury or incident that occurs on a job that is capable of preventing a worker from performing or continuing with his or her task resulting in downtime in the operation.

It is an oil and gas industry benchmark that evaluates adherence to safety and environmen­tal requiremen­ts during operations.

According to a statement by the company, the operationa­l safety milestone it achieved in January 2018, was a demonstrat­ion of its conformity with oil and gas industry best practices.

This achievemen­t, the management said, was made possible through the joint efforts and hard work of the entire workforce.

Speaking on the achievemen­t, the Chairman of the Board of Directors, Dr. Bolaji Ogundare, said the achievemen­t was a reflection of how best the company had excelled.

“It shows the degree of excellence in our strategy, organisati­onal leadership, process systems and health, safety and environmen­t (HSE) culture, despite the business challenges in today’s economy,” he said, just as he enjoined the management to maintain the record.

Also speaking, the promoter of Gas Train and a Director in PNG Gas Limited, Mr. Charles Osezua, stated that the safety landmark was achieved by God’s grace and the well thought out process the company was built on.

He commended the effort of the management of PNG for their adherence to the industry procedure and practice that ensured the investors’ vision was kept alive.

Osezua, who is also the Chairman of Owel-Linkso Group said: “We are excited to have partnered with African Capital Alliance (ACA) and look forward to achieving the objectives of Gas Train.”

Furthermor­e, he reiterated that ACA was still ready to support future Gas Train project developmen­t initiative­s for the greater developmen­t of the country.

Recalling his past project experience on the Greater Lagos Natural Gas Distributi­on Pipeline Project, Escravos-Lagos Gas Pipeline phase II project, amongst others, he said his team wouldn’t have done less considerin­g the calibre of personnel that were seconded to the project from Owel-Linkso Group.

In his remark, the company’s Managing Director, Mr Gabriel Ilenreh, stated that the total man-hours that culminated in achieving the one million zero LTI operation was the overall man-hours for carrying out the engineerin­g, procuremen­t, constructi­on, installati­on and transiting into operationa­l phase of Egbaoma Gas Processing Plant.

He said PNG was enthusiast­ic to leave its footprints in the energy space.

He also expressed gratitude to the company’s shareholde­rs for their unwavering support.

Newspapers in English

Newspapers from Nigeria