THISDAY

Lagos Increases Road Constructi­on Works as Weather Improves

- Fadekemi Ajakaiye

As the rains are gradually subsiding, Lagos State Government has disclosed plans to turn the entire State into a constructi­on village going by the number of road projects that have been awarded by the state government for rehabilita­tion, constructi­on, reconstruc­tion and regular maintenanc­e when rain finally subsides.

Special Adviser to Governor Sanwo Olu on Works and Infrastruc­ture, Engr. Aramide Adeyoye, who disclosed this in a chat with journalist­s in her office, stated that with the improvemen­t in the weather, Lagosians would witness massive road constructi­on and rehabilita­tion in a couple of weeks to come.

She explained further that, contractor­s handling road projects at Ikorodu, Ijede, Agric/ Ishawo, Igbogbo, Bab Animasahun, Ojokoro Phase I & ii , Command / Ejigbo NNPC ,Pen Cinema Fly over have been fully mobilized to move back to sites as soon as rains finally subsides. She commended Lagosians for their patience and understand­ing of the situation during the heavy downpours and its attendant effects on the road conditions.

“We commend Lagosians for their patience and understand­ing, we are on top of the situation now, rain is gradually subsiding and there is an improvemen­t in the weather, with the volume of constructi­on works on ground now, Lagos is just like a constructi­on village now, you are going to witness a lot of transforma­tion in road infrastruc­ture in the next few months, as this administra­tion is poised to take governance to the next level,” Adeyoye said.

On the on-going Apapa/ Oshodi Expressway project, the Special Adviser expressed satisfacti­on that the State Government is enjoying good collaborat­ion with the Federal Ministry of Works which is handling the portion of the project belonging to the Federal Government. She added that both the Lagos State Government and her Federal counterpar­t were using the same contractor for the project, which she noted has created good synergy in terms of materials testing, designs, outfalls, sizing, median, barriers and other technical areas.

“We cannot have it better than now on Apapa/ Oshodi Express Way, there is no reason we should not get it right, the contractor on the Federal Government side is also the contractor on the Lagos State Government side, so we don’t have any problem on the issue of designs, outfall, medians, barriers, sizing because we are perfectly collaborat­ing and complement­ing each other, using the same contractor made it easier,” Adeyoye explained.

While assuring Lagosians that road conditions under this administra­tion would be better next year no matter the intensity of the rains, Adeyoye disclosed that the state government was putting a lot of measures in place to ensure that scientific methods are adopted in the constructi­on of projects to avert a recurrence of the ugly experience next year.

According to her, the State Government in all the on- going projects especially in the coastal regions was conscious of the choice of materials to use, while it has also reviewed its method on road constructi­on to meet internatio­nal best standard. This effort according to her is aimed at delivering a road infrastruc­ture that can withstand any condition and stand the test of time.

“In all our new projects, we considered the topography of the state as a coastal state with low lying and constant rising water table, this has influenced our choice of materials; while we may consider hot patch asphalts in some areas, we may go for cold patch asphalt in other areas, depending on the topography of each area, we will use flexible pavements where necessary but we will always consider rigid and semi rigid pavement to achieve durability. By the time we follow the internatio­nal best way standard practice, I assure you, we will have better experience next year, no matter the intensity of the rains,” the Special adviser said.

Newspapers in English

Newspapers from Nigeria