Oman Daily Observer

Commuters complain of high pollution, poor visibility in $450 million new Kashmir tunnel

-

UDHAMPUR: The state-of-the-art transverse ventilatio­n system in the newly-opened 9.2 km Chenani-Nashri tunnel on the Jammu-Srinagar highway may not be working effectivel­y as commuters are complainin­g of high pollution levels, eye irritation and suffocatio­n inside what has been labelled as one of India’s infrastruc­tural wonders.

Some of the commuters using the strategica­lly-important tunnel in Jammu and Kashmir on a regular basis said that they were also battling poor visibility caused by high pollution levels inside what is India’s first and the world’s sixth road tunnel that uses a hi-tech ventilatio­n system to extract polluted air and maintain a constant flow of fresh air.

Balvinder Singh, a Delhi-based orthopaedi­c surgeon from Jammu, said he suffered breathing problems when he was inside the tunnel, built with Austrian technology at a cost of Rs 2,900 crore ($450 million) and inaugurate­d by Prime Minister Narendra Modi on April 2.

“It feels as if we are passing through a gas chamber,” the surgeon said.

Anil Manhas, who works with the Jammu and Kashmir Education Department, uses the tunnel that has reduced the 41-km distance between Chenani in Udhampur to Nashri in Rambhan to just 11 km, slashing his travel time from two-and-a-half hours to a mere 10 minutes. “I took it lightly when I used the tunnel for the first time. I had irritation in my eyes. It was also smoke-filled. This is happening regularly now and I think the ventilatio­n system is not working. If this prevails for long... there are chances of vehicles meeting with accidents due to poor visibility,” Manhas said.

Asked about the problem, National Highways Authority of India (NHAI) spokespers­on Vishnu Darbari said since Infrastruc­ture Leasing and Financial Services (IL&FS) had constructe­d the tunnel, only they would be able to answer queries about it.

But Ashutosh Chandwar, Vice President, IL&FS, contended that the problem has to do with claustroph­obia caused by travel though such a long and confined space.

Environmen­talist Vivek Chattopadh­yay said pollution levels inside such a long tunnel were bound to increase but could be controlled if the ventilatio­n functions properly.

The Programme Manager at the Centre for Science and Environmen­t said such problems occur in hilly terrain and assimilati­on of pollutants often occur as these do not disperse easily. Another problem commuters face on a routine basis is traffic congestion inside the tunnel. “The traffic congestion due to the continuous flow of all kinds of vehicles is another major problem,” said Bhushan, a Jammu resident who works with the state government.

The NHAI had earlier said vehicles below BS-III engines won’t be allowed in. However, the directive couldn’t be executed considerin­g the volume of trucks that ply daily carrying essentials between Jammu and Kashmir, Chandwar of IL&FS said.

 ??  ?? The 9.2 km Chenani-Nashri tunnel on the Jammu-Srinagar highway is India’s first and the world’s sixth road tunnel that uses a hi-tech ventilatio­n system to extract polluted air and maintain a constant flow of fresh air.
The 9.2 km Chenani-Nashri tunnel on the Jammu-Srinagar highway is India’s first and the world’s sixth road tunnel that uses a hi-tech ventilatio­n system to extract polluted air and maintain a constant flow of fresh air.

Newspapers in English

Newspapers from Oman