Manila Bulletin

AMA WATER IN THE PIPELINE

-

AMA Group Holdings Chairman Amable R. Aguiluz V said AMA Water is fast tracking its constructi­on of a 300mld world-class water treatment plant along the lakeshore of Laguna Lake in its desire to help address the current water supply crisis being experience­d in Metro Manila utilizing its water right up to 300mld granted by the Laguna Lake Developmen­t Authority.

Aguiluz said this project will be able to bring the much needed water supply augmentati­on within 10 months from its planned plant in an area close enough to the Metro area. He said he will work out the required arrangemen­ts both with the Laguna Lake Developmen­t Authority and the Metropolit­an Waterworks and Sewerage System in response to President Duterte’s call to address this problem on a long-term basis.

Aguiluz said that Laguna Lake, the country’s biggest freshwater resource located close to the heart of the national capital region, was already being harnessed by both Maynilad in Putatan, Muntinlupa City at 300 mld, and Manila Water in Cardona, Rizal at 120mld.

For this project, AMA Group Holdings is partnering with Ion Exchange, a Singapore-based company with projects all over Asia. AMA Water has signed as well an agreement with Aquagen Technologi­es, Inc. (ATI) as its local technical advisors for this project. Aguiluz is confident that AMA Water is well positioned to deliver clean and affordable drinking water to NCR going forward way ahead of other planned solutions like Kaliwa Dam which reportedly is scheduled to be operationa­l in 2022.

 ??  ??

Newspapers in English

Newspapers from Philippines