SCHEDULED INTERRUPTION
Here’s the list of scheduled power interruptions from March 9 - 15, 2024.
March 09, 2024 (Saturday)
[1] Time: 9:00 AM to 3:00 PM (6hrs) Purpose: To improve the reliability of the distribution system serving Brgy. Sambag II by facilitating replacement of primary pole.
Areas Affected:
Portion of Cebu City (Sambag II) along Aznar Road. [2] Time: 8:00 AM to 4:00 PM (8hrs) Purpose: To improve the reliability of the distribution system serving Brgy. Cansojong, Dumlog, Poblacion & San Isidro by facilitating installation of automatic reclosing device (recloser) and reconstruction of primary lines.
Areas Affected:
Portion of Talisay City (Cansojong, Dumlog, Poblacion & San Isidro) along Tres Alinos St., Rizal St., P. Del Rosario St., Cabalan St.,Gen. Luna St., Los Martires St., Lopez Jaena St., Burgos St., Uldog St., La Revolution St., Washington St., Main St., Garces St., Camotot St., La Patria St., Bascon St., Larry Revolution St., Machacao St., Gabi St. and Dieparine St. Including portions of sitio Litmon, Kalubihan, Asan, Rojaluca, Miramar, Letmon, Tres Alinos, San Ramona, Garden, Machacao, Mahayahay, Karots, Camanse, Tangkong, Taugi, Cebu Seafood Processing & Export Corporation, Alegrado Land Dev’t Corp., Sto. Nino Aquaculture Corporation, Philippine Student Alliance Lay Movement, Inc., Miramar Chapel, South Covina Homeowner’s Association Inc., Supreme Star Oil Inc. M2, Talisay City College, Sisters of Mary School-Girlstown, Inc., Philippine Seven Corporation, The Jesus Church Philippines Inc, E.R./ Gullas Talisay City Central School, Edotco Towers Inc, PLDT Inc., Dito Telecommunity Corporation, 7th Day Adventist Corporation, Sarihai Chapel, Sta. Teresita De Avila Parish/Rectory, Cabigas Churchill B, Tourganize Group of Companies inc., Frontier Tower Associates Philippines Inc., Talisay City Central Elem. School, Geo-Transport & Construction Inc., Talisay City Science High School, Verde Linear Corporation, Globe Telecommunication Inc., Eight Under PAR (Pawnshop Operator) Inc., Poblacion National High School, Ramon Aboitiz Foundation Inc., Sister of Mary School Girlstown Inc., and Innove Communications Inc. [3] Time: 9:00 AM to 5:00 PM (8hrs) Purpose: To prevent unnecessary interruptions due to obstruction of pole in the distribution system serving Brgy. Sta. Cruz by facilitating relocation of primary pole as per customer request.
Areas Affected:
Portion of Cebu City (Sta. Cruz) along A. Pond St, F. Ramos St., Lim Tian Teng ST., Osmeña BLVD and Junquera St., including G/F EMSU Building, New Lengths Hair Studio, Metropolitan Bank & Trust Co., Golden Arches Development Corp., and A&M Realty & Development Corporation. [4] Time: 9:00 AM to 10:00 AM (1hr); 4:00 PM to 5:00 PM (1hr) Purpose: To facilitate cutting of loops for isolation of working area; installation of loops for energization of working area.
Areas Affected:
Portion of Cebu City (Sta. Cruz) along F. Ramos St., Gen. Echavez St., Pelaez St., Junquera St., and Lim Tian Teng Road including Vicente P Velez Realty Corp., Vizcarra Pharmaceutical Inc., Matilde Realty Corp., Magsaysay Maritime Corp., Trends Group Inc., De Guzman-Lingad Dev’t and Management Corp., Jo & Pintor Eqp’t Realty Corp., The Well Hotel Inc., YY Company, Cebu City Gov’/Ramos Ticketing, J. Kings & Sons Co. Inc., Magsaysay Maritime Corp., Redbark Treasure Development Corp., Frema Realty and Development Corp., Mega Lending Inc., and R.G.M Marketing. [5] Time: 8:00 AM to 4:00 PM (8hrs) Purpose: To improve the reliability of the distribution system serving Brgy. Poblacion North & Tananas by facilitating primary line maintenance.
Areas Affected:
Portion of San Fernando (Poblacion North & Tananas) along Pedregosa Street, Kaanday St., including portions of Purok African Daisy, Sunflower, Gumamela, Fortune, Rosas, Santan, Bird Of Paradise and Sitios Tagaytay, Limbang, and San Antonio Chapel.
March 10, 2024 (Sunday)
[1] Time: 8:00 AM to 4:00 PM (8hrs) Purpose: To improve the reliability of the distribution system serving Brgy. Capitol Site by facilitating installation of primary pole.
Areas Affected:
Portion of Cebu City (Capitol Site) along Rosal, Walingwaling, Azucena and Llorente St., including Don Julio and Chong Hua Hospital. [2] Time: 9:00 AM to 3:00 PM (6hrs) Purpose: To improve the reliability of the distribution system serving Brgy. Cabancalan by facilitating reconstruction of primary lines.
Areas Affected:
Portion of Mandaue City (Cabancalan) including Castilex Compound. [3] Time: 8:00 AM to 4:00 PM (8hrs) Purpose: To prevent unnecessary interruptions due to obstruction of pole in the distribution system serving Brgy. Poblacion by facilitating relocation of primary pole as per customer request.
Areas Affected:
Portion of Liloan (Poblacion) including Bright Bee 2018 Foods Corporation. [4] Time: 8:00 AM to 4:00 PM (8hrs) Purpose: To increase the capacity of the distribution system serving Brgy. Lamac & Yati by facilitating extension of primary lines (line stringing).
Areas Affected:
Portion of Consolacion & Liloan (Lamac & Yati) along Cebu North Rd. including portion of Purok’s 1, 2, 3, Cebucao, Francisco, Gemilina, Tambis, Tree, Water Lily, Sitio’s Ayala, Kalubihan, Lamac, Molave, Pilapilan, San Francisco I, San Roque, Sto Nino, Tabok Lamac, Aboitiz Compound,Apas Compound, Centuryvine Residence, Cleofeville Subd., Consolacion Valley Home, D’Pearl Residences, David Heights Subdivision, Dream Heights 2, Eastland State Subdivion, El Monte Verde Subd., James Ville Heights Subdivision, Joanna Legacy Homes, Jorgiane Subdivision, Molave Highlands Subd., Nashville Cor Monterey, Primavera Hills Sub., Serenis North Subd., Vertacci Subd., Villa Elena Subd., Villa Melissa, Aboitizland Inc., Alhensen Development Inc., Asa Building Corporation, Eastland Property Ventures Inc., Edotco Towers, Inc., Nexus Real Estate Corp., Pacific Catv. Inc., Rizwoods Colleges Inc., Sta Cruz Chapel, & Sta Lucia Realty And Dev. Inc. [5] Time: 8:00 AM to 4:00 PM (8hrs) Purpose: To improve the reliability of the distribution system serving Brgy. Apas, Banilad, Lahug & San Antonio by facilitating primary line maintenance.
Areas Affected:
Portion of Cebu City (Apas, Banilad, Lahug & San Antonio) along portions of Camp Lapu-Lapu Road & Mactan Street, including portions of Sitios Calvario, Fatima, Kalbario, Kalubihan, Mahayahay, Panabang, Plaza, Rotunda, San Miguel, Sto. Nino, & Tangke, and Calvary Hills, Lahug Caa Compound, Nivel Hills, Pastrano Compound, San Antonio Village, San Antonio Village Ii, & San Miguel Subdivision.
March 12, 2024 (Tuesday)
[1] Time: 9:00 AM to 5:00 PM (8hrs) Purpose: To increase the capacity of the distribution system serving Brgy. Dumlog by facilitating upgrading of distribution transformer.
Areas Affected:
Portion of Talisay City (Dumlog) along E. Bascon St., P. Burgos St., Cabalan St., Washington St., P. Del Rosario St. and Gen. Luna St. Including portions of Sitios Kamalig, Bonbon, Riverside, Litmon, Miramar, Garden, Mahayahay, Taugi, Graceville, Univille Subd., and Caneda Maria Mercedes (Pump). [2] Time: 9:00 AM to 5:00 PM (8hrs) Purpose: To increase the capacity of the distribution system serving Brgy. Tubod by facilitating upgrading of distribution transformer.
Areas Affected:
Portion of Minglanilla (Tubod) along Upper Pakigne Road and Tubod National High School. [3] Time: 9:00 AM to 5:00 PM (8hrs) Purpose: To increase the capacity of the distribution system serving Brgy. Cadulawan by facilitating upgrading of distribution transformer.
Areas Affected:
Portion of Minglanilla (Cadulawan) Portions along Cadulawan Road. [4] Time: 9:00 AM to 5:00 PM (8hrs) Purpose: To improve the reliability of the distribution system serving Brgy. Guadalupe by facilitating relocation of primary pole for upcoming projects.
Areas Affected:
Portion of Cebu City (Guadalupe) including Sitio San Isidro, Grand Legacy Subdivision, Cebu Pyramid Const Corp-Pump and Holaysan Subdivision. [5] Time: 9:00 AM to 3:00 PM (6hrs) Purpose: To increase the capacity of the distribution system serving Brgy. Cotcot by facilitating upgrading of distribution transformer.
Areas Affected:
Portion of Liloan (Cotcot) along Ilaya St. including Mega Crown Realty and Development Corp. [6] Time: 9:00 AM to 5:00 PM (8hrs) Purpose: To improve the reliability of the distribution system serving Brgy. Pung-ol Sibugay by facilitating installation of primary pole.
Areas Affected:
Portion of Cebu City (Pung-ol Sibugay) including Sitio Highway, Globe Telecom Inc and Ayala Land Inc.
March 13, 2024 (Wednesday)
[1] Time: 9:00 AM to 5:00 PM (8hrs) Purpose: To increase the capacity of the distribution system serving Brgy. Tayud by facilitating installation of distribution transformer.
Areas Affected:
Portion of Consolacion (Tayud) Portion along ConsolacionTayud-Liloan Road. [2] Time: 9:00 AM to 5:00 PM (8hrs) Purpose: To increase the capacity of the distribution system serving Brgy. Pakigne by facilitating upgrading of distribution transformer.
Areas Affected:
Portion of Minglanilla (Pakigne) along Hope Street, Wisdom Street, and Portions of Belmont Village Pakigne.
March 14, 2024 (Thursday)
[1] Time: 9:00 AM to 5:00 PM (8hrs) Purpose: To increase the capacity of the distribution system serving Brgy. Tabunok by facilitating upgrading of distribution transformer.
Areas Affected:
Portion of Talisay City (Tabunok) along Pang-pang Road.
March 14-15, 2024 (Thursday-Friday)
[1] Time: 10:00 PM of March 14 to 6:00 AM of March 15 (8hrs) Purpose: To improve the reliability of the distribution system serving Brgy. Poblacion by facilitating reconstruction of primary lines.
Areas Affected:
Portion of Liloan (Poblacion) along Rizal St. and National Rd. Including Portions of Narra 1 Greenhills.
March 15, 2024 (Friday)
[1] Time: 9:00 AM to 5:00 PM (8hrs) Purpose: To improve the reliability of the distribution system serving Brgy. Sambag II by facilitating relocation of primary pole as per customer request and reconstruction of primary lines.
Areas Affected:
Portion of Cebu City (Sambag II) along P. Del Rosario Ext.,Aznar Rd.,and V. Rama Ave. Including Portions of Sitio Pailob, Aspire Homes and SWU Village.