Khaleej Times

Drydocks World finishes new wellhead platform

-

DUBAI — Drydocks World has announced the completion of the Rashid D wellhead platform jacket and topside for Techinp-FMC and end-client Dubai Petroleum.

The topside is an oil and gas processing module weighing 950 tonnes, designed for unmanned offshore operation with a life span of 25 years. It contains advanced piping and control systems, which were entirely fabricated, integrated and pre-commission­ed by Drydocks World. The 500-tonne jacket structure is designed to support the topside offshore in Dubai at a sea depth of 31m.

The scope of work also includes pile fabricatio­n, oil, water injection and gas riser’s fabricatio­n as well as subsea spools for connecting the platform to Dubai Petroleum’s existing offshore subsea network. This unmanned platform has the ability to handle oil, gas lift and water injection.

Sultan Ahmed bin Sulayem, group chairman and chief executive officer of DP World and Chairman of Ports, Customs and Free Zone Corporatio­n, said: “The completion of the flagship platform Rashid D culminates Drydocks World’s position as a provider of the best maritime services that support performanc­e in line with the vision of His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice-President and Prime Minister of the UAE and Ruler of Dubai.”

“Drydocks World is an innovation leader that ensures efficient services for customers in order to optimise satisfacti­on and attract more investment­s in the shipping and energy sectors, contributi­ng to the economic growth of the

The new facility contains advanced piping and control systems. —

Supplied photo UAE. which is on the way to achieve the strategic objectives of the UAE Vision 2021 and Dubai Plan 2021.”

“Capt Rado Antolovic phd, CEO and managing director of DP World’s Maritime Services Division, said: “The platform will be part of the Jalilah and Rashid field developmen­ts, and we are proud to provide our services to such an important offshore infrastruc­ture project. We are devoted to delivering all our projects to the highest quality and safety standards, and during this project the yard has achieved over 700,000 LTI free man-hours, which is a testament to the strong safety culture adopted throughout our organisati­on.”

Nabil Aouad, vice-president for subsea at TechnipFMC, added: “The Rashid D project marks another fast track achievemen­t performed by the joint efforts of Dubai Petroleum, Drydocks World Dubai and TechnipFMC to deliver this project in less than 10 months after award.” —

 ??  ??

Newspapers in English

Newspapers from United Arab Emirates