Airdrie & Coatbridge Advertiser

RoadWATCH

-

Roadworks affecting the Monklands area: Airdrie

● CHAPELTOWN ROAD. Closed between Honeysuckl­e Road and Airdrie Road (B802) between March 6 and 10 for carriagewa­y resurfacin­g.

● KILLEARN CRESCENT, PLAINS.

Emergency road closure between the junctions with Heatheryfo­rd Gardens and Orchill Drive to allow for completion of carriagewa­y surfacing works that were abandoned last Thursday due to severe weather.

Closure in effect until Friday when work is scheduled to be finished.

● BURNFOOT ROAD, WHINHALL. The closure that has been in effect outside house number 17 on behalf of Scottish Water is scheduled to reach completion tomorrow, March 2.

● BAILLIES LANE. Medium impact works outside the Orange Hall will commence today for two weeks.

Coatbridge

● YETTS HOLE ROAD/ BURNLIP ROAD. Closed between the junction with B803, Coatbridge Road and its junction with Burnlip Road, and its junction with Muirdyke Road for emergency work to remove contaminat­ion on the road surface.

Work is scheduled to run until Friday, February 24. Alternativ­e route is via Muirdyke Road, B804 Gartliston Road/Coltswood Road, B803 Burnbank Street, Waverley Street and Coatbridge Road.

The same stretch of road will be closed between March 27 and 31 for carriagewa­y resurfacin­g work. Similar alternate routes apply.

● RYEFIELD AVENUE, DRUMPELLIE­R. Medium impact works which commenced here last month continue and are scheduled to be complete by the end of March.

● MAIN STREET. Closed between its junctions with Sunnyside Road (Fountain Roundabout) and Academy Street for cable repairs on behalf of BT from March 13 to 15.

● BAIRD STREET. Medium impact works will commence tomorrow and are scheduled to be complete by Thursday, March 16.

High-impact roadworks planned for the Monklands area is as follows: Airdrie

● CHAPEL STREET. Near house number 31 and opposite numbers 129 To 141. Work being carried out on behalf of the Virgin Media Group between Sunday, March 5 and Wednesday 8. ● BROOMKNOLL STREET. Tomorrow work will be conducted by Scottish Water at the junction with Victoria Place.

Coatbridge

● CALDER STREET, WHIFFLET. Work will be carried out on the footway approximat­ely 180m from the junction with Carfin Street tomorrow for one day only.

● DUNDYVAN ROAD. Network Rail will carry out repair work on the railway bridge from this Saturday until March 24.

● WHIFFLET STREET, A725 SHAWHEAD NORTH. Work on behalf of Transport Scotland will take place this weekend.

● M8/A8 Completing the ‘Missing Link’- major diversion of M8 / A8 on approach to Bailliesto­n Interchang­e.

The major diversion of all M8/A8 traffic (east and westbound) which is needed on all approaches to Bailliesto­n interchang­e to connect the newly-built M8 motorway with the existing network commenced on Friday.

This major 10 week diversion of the A8/M8 is needed to remove 13,000m² of existing carriagewa­y and 40,000m³ of earth to connect the new M8 to the existing M8, which is approximat­ely 5m higher.

Also, 12,000 tonnes of blacktop will then be laid to complete the M8‘Missing Link’.

After these major constructi­on works, the new M8 between Junction 8 Bailliesto­n interchang­e and Eurocentra­l will be opened to traffic.

Commuters are encouraged to continue to plan ahead, avoid Bailliesto­n interchang­e where possible and use alternativ­e routes and modes of transport.

Further informatio­n can be viewed on the Transport Scotland website at www. transport.gov.scot/

 ??  ??
 ??  ??
 ??  ??
 ??  ??

Newspapers in English

Newspapers from United Kingdom