Airdrie & Coatbridge Advertiser
Projects need NLC go-ahead
This week’s planning applications for Monklands which have been submitted to North Lanarkshire Council are as follows –
North Lanarkshire Bio Power: alterations to approved plans for energy from easte (EfW) processing building incorporating reduction in building footprint, changes to building design, increase in height of ventilation stack to 80m, increase in gross energy output to 27MW, increase in throughput of waste fuel by 24,000 tonnes to 204,000 dry tonnes per annum, and associated access improvements to A8 junction; at land at former Shanks & McEwan site, 251 Glasgow and Edinburgh Road, Coatbridge.
Anthony Murray: proposed change of use of ground-floor shop to health/leisure use and cafe; and fascia signage and window vinyls; both at 42-46 South Bridge Street, Airdrie.
Wireless Infrastructure Group: installation of 25m communications tower, antennas, ground-based apparaturs and ancillary development (to replace existing temporary tower); at site off Woodhall Mill Road, Chapelhall.
Mark Smith: two-storey side extension; at 7 Meigle Road, Cairnhill.
Mr A McOwan: external fabric repairs and frontage upgrade; at 93 Main Street, Coatbridge.
Montagu Evans LLP: request for environmental impact assessment scoping opinion for residential development and associated infrastructure; at Heathfield Farm, Drumcavel Road, Muirhead.