Evening Telegraph (First Edition)

Assurances over condition of sea wall

-

DUNDEE City Council has promised a soon-to-be upgraded sea wall is fully secure amid concerns over its deteriorat­ion.

Pictures show chunks of stone in a section of the Broughty Ferry wall on Douglas Terrace near the lifeboat shed have become loose or have fallen.

The wall, used as a flood protection measure, is continuall­y repaired, usually using concrete to fill in the gaps – but the whole stretch is due to upgraded by early 2020.

Douglas Terrace resident Ian Stewart said he had noticed deteriorat­ion for some time and hoped it would still be fixed before the major works started.

He said: “My fear is that the weakened sea wall leads to severe damage to the road. You can see it’s in bad condition.

“It needs to be repaired before the new sea wall is built.”

Broughty Ferry councillor Craig Duncan said he believes some of the damage is likely to have been caused by the heavy rain and flooding at the start of the month.

He said: “I regularly walk that stretch of beach myself to check on the condition of the sea wall. I fully understand that it doesn’t make sense to carry out expensive repairs just a few months before the work starts.

“It is imperative that the integrity of the existing wall and the safety of carriagewa­y and safety of the footpath users be preserved.”

A council spokesman said: “Council officers have responded to Councillor Duncan and assured him that the locations will be inspected and if necessary repaired.”

Newspapers in English

Newspapers from United Kingdom