Glasgow Times

Planning chiefs approve 20m 5G mast build

Structure shouldn’t impact pedestrian­s

- BY STEPH BRAWN

PLANNING chiefs have given the go-ahead for a 20-metre-high 5G mast to be built in a residentia­l area of Renfrew. CK Hutchison Networks Ltd asked Renfrewshi­re Council if it could place the towering piece of equipment in Paisley Road between numbers 234 and 248.

And the planning department has now responded saying the firm needs no prior approval to put up the mast.

It would be operated by H3G – better known as the phone network Three – which is in the process of building “the UK’s fastest 5G network”.

In documents submitted by agents WHP Telecoms, it states there is a need to upgrade the network in the area to provide improved coverage and capacity. The papers say: “This proposal forms part of an integral requiremen­t for CK Hutchison Networks (UK) Ltd to expand its 5G telecommun­ications network across Renfrew, specifical­ly in this instance to enhance 5G coverage levels and network capacity within the Moorpark area.

“Three are in the process of building out the UK’s fastest 5G network.

“To bring this new technology to the people, CK Hutchison Networks will need to provide a mix of upgrades to existing sites and the building of new sites.

“Mobile phone base stations operate on low power and accordingl­y base stations, therefore, need to be located in the areas they are required to serve. Increasing­ly, people are also using their mobiles in their homes and this means we need to position base stations in, or close to, residentia­l areas.

“The site has been selected on a wide adopted area of the highway in a position that will not impede pedestrian flow or the safety of passing motorists.

“This equipment is considered unlikely to have any material impact on the local area but significan­t connectivi­ty improvemen­ts.”

CK Hutchison Networks says because the location is surrounded by tall trees and streetligh­ts the mast should “blend in” to the area.

The company insists the height of the pole has been kept down to the “absolute minimum” while ensuring it is still capable of providing the new 5G coverage.

Alasdair Morrison, the council’s head of economy and developmen­t, said in his decision notice: “I have examined your proposal and consider it is unlikely to have a significan­t impact on its surroundin­gs.

“The proposed developmen­t can be carried out with five years.”

The overall performanc­e rate of 5G, which was introduced in 2019, is said to be up to 100 times faster than that of 4G, offering download speeds of between 10 and 20 gigabytes per second.

This means it would take around two minutes to download a threehour film.

 ?? ?? The 5G mast would be operated by Three
The 5G mast would be operated by Three

Newspapers in English

Newspapers from United Kingdom