Stirling Observer

Plans lodged

-

Planning applicatio­ns submitted to Stirling Council w/e May 31.

BLANEFIELD Installati­on of air source heat pump on ground beside external wall of house at Townhead of Auchengill­an G63 9AU for Ms Lucinda Ferguson. GARGUNNOCK Garage/store at Applegarth FK8 3BG for Mr Gary Shepherd; Extension to side and rear of house at Tigh

Allan FK9 4AN for Mrs and Mr Carol and Mikel Richter.

KILLEARN Extensions to single storey bungalow, formation of raised patio with balustrade, air source heat pump on side elevation, alteration­s to existing access including new pillars and gates and erection of new detached single storey garage at 18 Drumbeg Loan G63 9LG for Mr David Hunter; Installati­on of seven solar powered street lamps to illuminate car parking areas within curtilage of existing flatted developmen­t (retrospect­ive) at land and building at Killearn Court, The Square for Killearn Developmen­ts Ltd.

PORT OF MENTEITH Peatland restoratio­n scheme at Malling Farm FK8 3RD for Mr Mungo Ingleby.

Schedule at planning reception, council access points, libraries and www.stirling.gov.uk.

Applicatio­ns submitted to Loch Lomond and Trossachs National Park Authority w/b May 22.

BALMAHA Alteration­s to retaining wall and installati­on of four electric vehicle charging points, installati­on of mesh fencing around existing air source heat pumps at Visitors Centre, Main Road for Mr Paul Scullion, LLTNPA.

CALLANDER Further applicatio­n (under section 42) for planning permission for alteration­s to approved layout of existing caravan park to site a maximum of 247 caravans including minimum of 99 touring caravans for variation of Condition 1 to allow year-round operation period at Callander Woods Holiday Park, Stirling Road for Mrs Margaretwo­od,wood Leisure; Installati­on of two pole mounted signs at Loch Lubnaig car park north and Loch Lubnaig car park south, Callander and Strathyre, for Mrs Leigh Hamilton, LLTNPA

Newspapers in English

Newspapers from United Kingdom