The Courier & Advertiser (Perth and Perthshire Edition)

Proposal to prevent ash clouds blighting villages

Plan from Scottish Power to cap ash lagoons permanentl­y looks set to be approved

- AILEEN ROBERTSON arobertson@thecourier.co.uk

A plan to prevent a repeat of the dust clouds which have blighted west Fife villages is set for approval.

The central and west planning committee will be asked to approve Scottish Power’s plans to permanentl­y cap three lagoons containing ash from the former coal-fired Longannet Power Station at Kincardine next week.

The station closed in 2016 and has been demolished. However, in April 2017, following a prolonged spell of dry weather, ash from the lagoons at Low Valleyfiel­d billowed into the air and was blown across nearby west Fife communitie­s.

Areporttot­heFifeCoun­cilcommitt­ee says: “The proposed capping of the remaining ash lagoons is one of the final chapters in the Longannet Power Station story, and is necessary to allow the applicant to surrender the Pollution Prevention and Control permit and to guard against any recurrence of windblown ash detrimenta­lly affecting local residents, as occurred in 2017.”

It is a requiremen­t of the previous planning permission that the site is capped and restored.

Locals previously raised fears the dust clouds contained toxic chemicals but the Scottish Environmen­t Protection Agency said this was not the case.

Since then, as a temporary measure,

water has been pumped into the lagoons to prevent them from drying out.

The plans being put before councillor­s on Tuesday involve filling in and landscapin­g the lagoons. One will be designed to continue to flood in wet weather.

The proposal differs from the original plans put to a consultati­on in 2018. It now includes a 40ft wind turbine, which will power a water management system.

RSPB Scotland and NatureScot, formerly known as Scottish Natural Heritage, originally objected to the loss of open water habitat for birds but withdrew their objections after

discussion­s with Scottish Power which resulted in the plans being amended.

A balance had to be struck between finding a suitable proposal for the site on the banks of the Forth, which is next to a Site of Special Scientific Interest and Special Protection Area, and allaying residents’ concerns about open water being abreedingg­roundformo­squitoes.

The planning report says areas of standing water would be reduced to the minimum area acceptable.

If approved, the project is expected to take between 12 and 18 months to complete.

If approved, the project is expected to take between 12 and 18 months

 ?? Picture: Kris Miller. ?? A sign warns of potential dangers at the Low Valleyfiel­d ash lagoons.
Picture: Kris Miller. A sign warns of potential dangers at the Low Valleyfiel­d ash lagoons.

Newspapers in English

Newspapers from United Kingdom