Yorkshire Post

HS2 champion says railway line is ‘vital for our future’

- TOM RICHMOND COMMENT EDITOR ■ Email: tom.richmond@ypn.co.uk ■ Twitter: @OpinionYP

THE FOUNDING father of HS2 says today that high-speed rail is the only way to improve services across the North’s network, as a cross-party alliance of Yorkshire backbenche­rs pressed Boris Johnson for immediate improvemen­ts to commuter routes.

Andrew Adonis, who instigated the HS2 project when Transport Secretary in Gordon Brown’s government, says building a new North-South line is the best way to increase capacity as Ministers consider whether the £100bnplus cost is economical­ly justifiabl­e or not.

“It could not be more vital to our economic future,” the Labour peer writes in The Yorkshire Post.

“Rail demand has doubled in the past 15 years alone.

“HS2 does not just meet this demand for intercity travel; by freeing up substantia­l capacity on the existing lines it will make it possible to run far more freight trains and commuter and regional passenger services.

“The big question is, if not HS2, what? The only alternativ­e to HS2 for dealing with the capacity crunch is massive further upgrades of the existing Victorian railway.”

Transport Secretary Grant Shapps confirmed that the Oakervee review into HS2 will be published next month amid speculatio­n that the links from Birmingham

to Leeds and Manchester could be delayed.

Meanwhile, three West Yorkshire MPs pressed Mr Johnson to commit to improving commuter services as the DfT considers the future of the Northern and TransPenni­ne Express franchises following months of delays and cancellati­ons.

Conservati­ve MPs Mark Eastwood (Dewsbury) and Craig Whittaker (Calder Valley) were joined by Labour’s Holly Lynch, who represents Halifax, as pressure grew on Mr Johnson.

Asked if the Government would back both HS2, and Northern Powerhouse Rail, Mr Johnson said: “We are already investing a record £48bn in rail services, excluding HS2. It is right that we should look at the value that this country could get from a scheme as costly as HS2, with estimates now rising to £100bn.”

WHAT DO the Victoria Line, the Jubilee Line, the Channel Tunnel, the M25 and Buckingham Palace all have in common?

They were wildly over budget, long delayed – and the Treasury wanted to cancel them all.

HS2 is going through this stop-start phase.

Let’s hope it survives or it will ultimately be built over an even longer timescale, costing even more.

If this weren’t Britain, one would make the argument for HS2 from internatio­nal best practice.

There is a reason why Japan, France, Germany, Italy, China, Korea, Holland, Belgium, Spain and Taiwan all have highspeed rail.

It works.

It is the best modern, green way to connect big cities like Manchester, Leeds, Birmingham and London.

Japan opened its key high speed line linking Tokyo, Nagoya and Osaka – a vital inter-urban corridor akin to LondonBirm­ingham-Manchester-Leeds – 56 years ago.

It has been the making of modern Japan, just as the TGV from Lille and Paris to Lyon and Marseille has been the making of modern France.

Any suggestion that they are ‘white elephants’ would be greeted with incredulit­y.

From the outset, the central argument for HS2 has been about capacity, with speed and connectivi­ty as significan­t additional benefits.

Since I launched HS2 in 2010, the imperative for more capacity has become greater still.

HS2 links the four largest cities and city regions of the UK, centred on London, Birmingham, Manchester and Leeds, while also providing direct services to Glasgow, Edinburgh, Liverpool, Newcastle and cities in South Yorkshire and the East Midlands.

It could not be more vital to our economic future.

Rail demand has doubled in the past 15 years alone. HS2 does not just meet this demand for intercity travel; by freeing up substantia­l capacity on the existing lines it will make it possible to run far more freight trains and commuter and regional passenger services.

The big question is, if not HS2, what? The only alternativ­e to HS2 for dealing with the capacity crunch is massive further upgrades of the existing Victorian railway.

The last modest upgrade of the West Coast Main Line cost £9bn, £1bn of which was simply to pay train operators for not running trains due to the disruption in a decade of constant upheaval – quite apart from the huge cost of disruption borne by passengers and businesses.

Upgrading a busy main-line railway is like conducting open-heart surgery on a moving patient.

To put this in perspectiv­e, the Cameron government identified an upgrade alternativ­e to HS2 from London to Birmingham, Manchester and Leeds.

It costs half as much as HS2 but provides only a quarter of the extra capacity, and it involves decades of chronic passenger disruption. As for journey times, as HS2 proceeds north of Birmingham, the time savings become steadily greater: an hour off every journey between London and Manchester, Sheffield and Leeds. How better to bridge the North-South divide?

HS2 not only transforms connection­s between London and cities in the Midlands and the North but also between the cities of the Midlands and the North, and within the North itself.

The Victorian railway companies built mostly separate main lines from provincial cities to London, which is why rail links between most of our regional cities are so bad.

Birmingham and Manchester are only 67 miles apart, yet the rail journey time between them takes one and a half hours. It will be just 40 minutes by HS2.

Sheffield to Manchester could be reduced to 30 minutes if HS2 is aligned with Northern Powerhouse Rail, the proposed west-east rail upgrade between the Northern cities.

Oh, and try the ‘expensive white elephant’ jibe on commuters crammed into the Jubilee line to Canary Wharf. The response you will get is – why is Crossrail, being built to relieve congestion on the Jubilee and Central lines, still not open?

Answer, it is way over budget and delayed.

Upgrading a busy main-line railway is like conducting open-heart surgery on a moving patient.

 ??  ?? ANDREW ADONIS: The peer instigated the HS2 project when he was Transport Secretary.
ANDREW ADONIS: The peer instigated the HS2 project when he was Transport Secretary.
 ?? PICTURE: TOLGA AKMEN/AFP/GETTY ?? STOP AND START: Workers stand near a sign outide a constructi­on site for a section of the HS2 railway project, at London’s Euston station.
PICTURE: TOLGA AKMEN/AFP/GETTY STOP AND START: Workers stand near a sign outide a constructi­on site for a section of the HS2 railway project, at London’s Euston station.
 ??  ??

Newspapers in English

Newspapers from United Kingdom