PennDOT announces road work, closures throughout Delco
Pennsylvania Department of Transportation Engineering District 6-0 announces the following road closures and construction work in Delaware County:
Chester
• Crosby Street, closed with posted detour between 12th and 13th streets, 24hour detour through Oct. 14
• I-95 South, shoulder closures between Melrose Avenue and Crosby St., 7 a.m.-3 p.m. March 21-23
Clifton Heights, Upper Darby, Lansdowne
• Baltimore Avenue, lane restrictions at Springfield Road, Church Lane, Delmar Drive, Diamond Street and Home Depot Drive; Lansdowne, Wycombe, Union and Mansfield avenues, Martin Drive and Walsh Road; Penn Boulevard/Fourth Street, Burmont and Scottdale roads, Church Lane; Church Street, Marple, Jackson, Springfield, Bishop and Glenwood avenues, 9 a.m.-3 p.m. March 20-24
Clifton Heights, Upper Darby, Lansdowne, Springfield
• Springfield Road, closed with posted detour between Saxer and Oak avenues. 9 a.m.-3 p.m. weekdays through April 8; closed with posted detour between Providence Road and Oak Ave., weekdays 9 a.m.-3 p.m. through July 2
Concord
• U.S. 322 East and West (Conchester Highway) periodic lane restrictions between U.S. 1 (Baltimore Pike) and Clayton Park Drive, 9 a.m.-3 p.m., 7 a.m.-5 a.m. weekdays through March 20-Oct. 20; lane restrictions between US 1 and Evergreen Drive, 9 a.m.-3 p.m. March 20-24
• Smithbridge Road, lane restrictions between Feldspar Drive and US 202, 9 a.m.-3 p.m. March 20-21
• US 202 South (Wilmington/West Chester Pike), lane restrictions between Smithbridge and Beaver Valley roads, weekdays 9 a.m.-3 p.m. through March 20-21
Haverford
• US 1 North and South (City Line Avenue), lane restrictions between Grove Place and Rolling Road, weekdays 9 a.m.-3 p.m. through April 7
• College Avenue, lane restrictions between Walton Lane and Haverford Road, 9 a.m.-3 p.m. March 20-24; closed with posted detour between Spring Mill Road and Haverford Road, 24hour detour through Nov. 7
• Darby Road, lane restrictions between Sproul (PA 320) and Radnor roads, 9 a.m.-3 p.m. weekdays through May 31
Haverford, Upper Darby
• West Chester Pike (PA 3), lane closure at Brief and Pennock avenues, Carol Boulevard, State and Copley roads, and Terminal Square, 9 a.m.-3 p.m. March 20-24
Marcus Hook, Trainer
• US 13 (10th Street/ Post Road), lane restrictions between Blueball Avenue and Penn Ave./Walnut St., 9 a.m.-3 p.m. weekdays through March 31
Millbourne
• PA 3 (Market Street), lane closure at Chatham, Forge and Copley roads, Terminal Square and Millbourne Avenue, 9 a.m.-3 p.m. March 2024
Nether Providence
• Beatty Road, lane restrictions at Surrey Lane and Meredith Drive, 9 a.m.-3 p.m. through March 24
Newtown
• Bryn Mawr Avenue, lane restrictions between Malin and Hunt roads, 7-3 p.m. March 20-24
• Newtown Road/Newtown Street Road, closed with posted detour between Waterloo Road and Wyola Drive, 9 a.m.-3 p.m. weekdays through April 14
Radnor
• Conestoga Road, closed with posted detour between Lancaster Avenue (US 30) and Church Road, 9 a.m.-3 p.m. weekdays through June 30
• US 30 West (Lancaster Avenue), right lane closed between PA 320 (Spring Mill Road) and Ithan Avenue, 9 a.m.-3 p.m. March 20-24
Springfield, Upper Darby, Clifton Heights
• Springfield Road, closed and detoured between Saxer and Oak avenues, 9 a.m.-3 p.m. weekdays through April 8
Tinicum
• Fourth Avenue, closed with posted detour between Second Street and Governor Printz Boulevard, weekdays 9 a.m.-3 p.m. March 24
Upper Chichester
• Blue Ball Avenue, closed with posted detour between Columbia and Scott avenues, 24-hour detour through Aug. 15
Upper Darby
• Garrett Road, lane closure between Kirks Lane and Irvington Road, weekdays 9 a.m.-3 p.m. through March 22
• US 1 North and South (Township Line Road), lane restrictions between Bella Vista and Dermond roads, weekdays 9 a.m.-3 p.m. through March 31
US 322 work gets underway
Pennsylvania Department of Transportation (PennDOT) announces preliminary construction is scheduled to begin Monday, March 20, on the first of two mainline projects to widen and reconstruct a 6.7-mile section of U.S. 322 (Conchester Highway) from U.S. 1 (Baltimore Pike) to just east of Route 452 (Market Street) in Concord, Bethel and Upper Chichester townships.
From 9 a.m.-3 p.m. Monday, March 20-Friday, March 24, U.S. 322 motorists will encounter single lane conditions between U.S. 1 (Baltimore Pike) and Evergreen Drive, for clearing operations. Traffic will be controlled by flagging.
This preliminary work is part of a $62.7 million project to improve travel and safety on the first section, or western section of U.S. 322 (Conchester Highway) from U.S. 1 (Baltimore Pike) to just east of Mattson Road/ Featherbed Lane near Clayton Park in Concord Township, by widening the highway from two lanes to four lanes with a grass median separating the eastbound and westbound travel lanes.
The scope of work on the first section also includes:
• Reconstructing, widening and upgrading five intersections to provide four through lanes and turn lanes on U.S. 322 at Evergreen Drive, Fellowship Drive/Station Road, Cambridge Drive, Featherbed Lane/Mattson Road and Clayton Park Drive
• Upgrading traffic signals on U.S. 322 at U.S. 1 (Baltimore Pike), Evergreen Drive, Fellowship Drive/ Station Road and Featherbed Lane/Mattson Road
• Eliminating through and left turn movements on Spring Valley Road, Merion Drive, Cambridge Drive, Station Road and Clayton Park Drive
• Installing three dynamic message signs, six closed circuit TV cameras, and Bluetooth tag readers to optimize traffic flow
In addition, the bridge carrying U.S. 322 (Conchester Highway) over SEPTA/Webb Creek and the bridge over Smith Bridge Road will be replaced. Five retaining walls and a sound barrier will also be constructed in this section.
During construction, U.S. 322 (Conchester Highway) between U.S. 1 (Baltimore Pike) and Clayton Park Drive will remain open to one lane of traffic in each direction during peak travel times. Periodic flagger-controlled lane restrictions may occur 9 a.m.-3 p.m. Mondays through Fridays and from 7 p.m. to 5 a.m. for various operations as construction advances along the corridor.
Work on the first mainline section of U.S. 322 is scheduled to be completed in fall 2020.
PennDOT has launched a new website — us322conchester.com — to keep motorists and residents informed during the reconstruction and widening of U.S. 322. The site provides updated construction details and photos, graphics showing improvements at each intersection, travel information for commuters, a form for submitting questions or comments, and an email subscription service for receiving news and other information about the project.
For PennDOT information, visit www.penndot.gov. Follow local PennDOT Information on Twitter at www. twitter.com/511PAPhilly, and follow the department on Facebook at www.facebook.com/pennsylvaniadepartmentoftransportation and Instagram at www.instagram.com/pennsylvaniadot