Dayton Daily News

MAJOR 2023 ODOT PROJECTS

-

GREENE COUNTY

$40 million for constructi­ng an interchang­e at the intersecti­on of US 35 and Valley/Trebein Road, west of Xenia. Project includes upgrading 1.28 miles of US 35 to a limited-access facility, bridge constructi­on, retaining wall constructi­on, and upgrades to Valley and Trebein roads at the intersecti­on.

$12.6 million for resurfacin­g and complete pavement repairs on Ohio 72 in Greene County from about 0.26 miles north of the westbound US 35 exit ramp to the Cedarville southern corp. limit near Turnbull Road.

$4.9 million for resurfacin­g and pavement repairs on US 35 from the interchang­e with Old US 35 to the Fayette County line.

WARREN COUNTY

$4.73 million for ongoing constructi­on of an onramp from southbound Mason-Montgomery Road to southbound I-71.

$3.5 million for bridge rehabilita­tion projects on Irwin Simpson Road over I-71, on Waynesvill­e Road over I-71, and on Stubbs Mill Road over I-71.

$3.42 million for constructi­on of a 10-foot-wide shared use path in Franklin. A bridge will be used for the bike path to cross Clear Creek just north of Hazelwood Park, and the bike path will cross under the I-75 bridge over Clear Creek.

$3.3 million for bridge rehabilita­tion on SR 73 over the Little Miami River at Waynesvill­e and replacemen­t of the bridge on Ohio73 over Corwin Nixon Road and the Little Miami Bike Path near the intersecti­on with Corwin Road.

$3 million for resurfacin­g Ohio 48, between Loveland and the northern corporatio­n limit of Maineville and from the northern corporatio­n limit of Lebanon to Ohio 73, as well as on Ohio 122, between Ohio 123 and Ohio 48.

MONTGOMERY COUNTY

$51.4 million for major rehabilita­tion of I-75 by rebuilding with asphalt between Ohio 741 and Dixie Drive Interchang­es.

$38 million for major rehabilita­tion of I-75 pavement by rebuilding with asphalt between Ohio 4 and Needmore Road Interchang­es.

$10.3 million for reconfigur­ing the U.S. Route 35/ Woodman Drive interchang­e into a tight urban diamond. Replacing bridge deck and installing sidewalk on Woodman Drive.

$7.5 million for bridge deck replacemen­t and other structural repairs on Ohio 4 over Webster Street and Keowee Street.

$3.25 million for resurfacin­g and installati­on of curb, gutter, sidewalk, storm infrastruc­ture and lighting on West Springfiel­d Street. The roadway will be altered from four lanes to two lanes with a center left turn lane and bicycle facilities in Riverside.

MIAMI COUNTY

$6.3 million for West Main Street corridor improvemen­ts in Troy from west of Ridge Avenue intersecti­on to I-75 northbound ramps. Improvemen­ts include widening of the street, reconstruc­tion of the sidewalk and curb lawn, upgrading the signal at Dorset Road, upsizing a watermain and improving the stormwater system along the corridor.

$4.3 million for resurfacin­g and related work on I-75 from County Road 25A interchang­e in Piqua to just south of the rest areas, including rest area parking lots in the northbound and southbound direction.

$2.1 million for replacemen­t of the existing inadequate pedestrian bikeway bridge with an ADA accessible bridge located in a more scenic location on the south side of Piqua.

Newspapers in English

Newspapers from United States