- By James Dulley Send questions to Here’s How, 6906 Royalgreen Drive, Cincinnati, OH 45244, or visit www.dulley.com.

Q : I’m planning a veggie garden on my sloping lot so I need a retaining wall. I have used timbers before, but blocks might hold up better. Which method do you prefer? — Steve W. A : Both methods for building a retaining wall are effective and can be attractive depending on the landscapin­g appearance you are seeking. Retaining wall blocks create a more formal look, while using railroad ties or landscapin­g timbers appears more rustic.

It might seem as though stacking up landscapin­g timbers is the simplest do-it-yourself method to build a retaining wall, but it is the most difficult to do properly. I have seen many timber retaining walls rot and collapse because they were not installed properly. It is not easy to replace the timbers later without disturbing the garden area.

If you want to build a curved retaining wall, then retaining wall blocks are the best method. Even if you do not need to have the wall curved, a slight curvature can be very attractive. An S-shaped retaining wall is particular­ly appealing because it provides a location on the lower level for an ornamental shrub or small tree.

The most difficult part of building a wall with blocks is just carrying them to your backyard. They are heavy, but not unmanageab­le. Even if you use a wheelbarro­w to make it easier, there is a lot of lifting. After moving them to the HERE’S HOW wall location, it would be wise to wait until the following day to start building the wall. It can be pretty hard on your back.

Purchase special interlocki­ng retaining wall blocks at your home center store.

These blocks fit together when stacked so they will not tip over from the weight of the soil behind them. There are various designs and degrees of offset (how far back each successive row is positioned), so take your time selecting them.

The key to installing a block retaining wall is preparing the ground for the first row. You should dig out a foundation area where the first blocks will rest. It should be about 1 inch deep for each 8 inches of wall height. Dig this area only as wide as the blocks and try not to disturb the nearby soil.

This foundation area should be level, so its depth may vary somewhat.

Once you have it dug out and leveled, tamp it down with a 4x4 beam or a hand tamper. It is important to have a solid base so it does not settle. Once the base row is laid, let them settle for a day or two before completing the wall. When you find some that are not level, remove them and pour a little sand or fine gravel under them to bring them to level.

Don’t use loose soil you have dug out because it may wash away and they will be out of level again.

Stack the successive rows of blocks until you have the wall to the desired height. Backfill each completed row with soil.

Many block systems have a finishing cap to cover the final block, so this will add a little more overall height to the retaining wall.

 ??  ??