Road work ahead
■ Interstate 15 will be restricted in both directions between Russell and Warm Springs roads from 9 a.m. Tuesday to 4 a.m. Wednesday. Crews are inspecting bridges.
■ The Russell Road onramp to southbound U.S. Highway 95 in Henderson will be closed from 9 p.m. to 5 a.m. Monday to Thursday. The highway’s southbound right lane will also be closed near Russell at this time. Crews are installing lights on overhead signs.
■ Tropicana Avenue will be restricted in both directions between Arville Street and Interstate 15 from 9 a.m. Wednesday to 4 a.m. Thursday. Crews are inspecting bridges.
■ North Fifth and North Lawrence streets will be closed between East Ann Road and El Campo Grande in North Las Vegas through Saturday. Crews are making storm drain improvements.
■ Fremont Street will be closed between 7th and 11th streets from 6 a.m. Tuesday to noon Oct. 3 for the Las Vegas Bike Fest.
■ Bonanza Road is restricted between 19th Street and Mojave Road through Friday as crews install gas lines.
■ Sunset Road will be restricted at Grand Canyon Drive from 7 a.m. to 5 p.m. Monday through Thursday. Clark County Water Reclamation District is conducting survey work.
■ Fort Apache Road will be restricted at Post Road from 7 a.m. to 5 p.m. Monday through Thursday. Clark County Water Reclamation District is conducting survey work.
■ Carey Avenue will be restricted around Pariva Street from 7 a.m. to 3 p.m. Monday and Tuesday for sewer work.
■ The ramp leading from westbound Warm Springs Road to the westbound 215 Beltway will be closed from 7 p.m. to 5 a.m. Sundays through Fridays until mid-March. Crews are working on the new flyover ramp and bridge.
■ The Martin Luther King Boulevard onramp to northbound U.S. Highway 95 will is closed through November. Crews are erecting retaining walls around the Spaghetti Bowl interchange as part of Project Neon.
■ Cliff Shadows Parkway and Lone Mountain Drive are restricted at the 215 Beltway through Oct. 16. Crews are realigning the Beltway.
■ Summerlin Parkway is restricted between Buffalo Drive and the 215 Beltway through Saturday. Crews are installing a cable rail median.
■ Buffalo Drive will be restricted between Sky Pointe and Grand Teton Drive from 7 a.m. to 4 p.m. weekdays through Oct. 15 as crews improve pedestrian crossings.
■ Cimarron Road will be restricted between Sky Pointe and Grand Teton Drive from 7 a.m. to 4 p.m. weekdays through Oct. 15 as crews improve pedestrian crossings.
■ Elkhorn Road will be restricted between U.S. Highway 95 and Tenaya Way from 7 a.m. to 4 p.m. weekdays through Oct. 15 as crews work on road improvements.
■ Sections of Bonneville Avenue, Charleston Boulevard, Grand Central Parkway and Martin Luther King Boulevard will have closed or disrupted lanes surrounding the Spaghetti Bowl as crews work on Project Neon through July 2018.
■ Traffic will be redirected and reduced to one lane in each direction of U.S. Highway 95 for about a mile in Boulder City through March. Crews are building a bridge over the highway for the future Interstate 11 corridor.
■ Valley Drive is being widened between Tropical Parkway and Cheyenne Avenue in North Las Vegas, with completion expected in March. Questions and comments should be sent to roadwarrior@reviewjournal.com. Please include your phone number. Follow the Road barrior on Twitter: @ RJroadwarrior