Los Angeles Times

Bomber assembly rouses Northrop’s secret desert site

Pentagon plans to buy 100 of the defense contractor’s B-21s for at least $80 billion.

- By Ralph Vartabedia­n, W.J. Hennigan and Samantha Masunaga

A once-empty parking lot at Northrop Grumman Corp.’s top-secret aircraft plant in Palmdale is now jammed with cars that pour in during the predawn hours.

More than a thousand new employees are working for the time being in rows of temporary trailers, a dozen tan-colored tents and a vast assembly hangar at the desert site near the edge of urban Los Angeles County.

It is here that Northrop is building the Air Force’s new B-21 bomber, a stealthy batwinged jet that is being designed to slip behind any adversary’s air defense system and deliver devastatin­g airstrikes for decades to come. The Pentagon is aiming to buy 100 of the bombers by the mid-2030s for at least $80 billion, though the exact amount is classified.

Northrop won the bomber contract in 2015, but the pace of activity is ramping up sharply under an Air Force budget that has reached $2 billion for this fiscal year.

Constructi­on crews are getting ready to add 1 million square feet to the plant, a 50% increase over what is already a huge facility that is protected by razor wiretopped fences, electronic sensors and military air space surveillan­ce, according to interviews and government documents.

The project marks a sharp turnaround in the fortunes of the Southern California aerospace industry, which has been atrophying since the end of the Cold War. It was widely assumed that the region would never

again be home to a large aircraft manufactur­ing program, and now it has one of the largest in modern history. The program is breathing new life into an industry that once defined the Southern California economy.

The bomber — dubbed the “Raider” — is expected to become Northrop’s largest cash cow, which could run for two decades if it does not encounter technical or political setbacks. But it will be competing with other nuclear and nonnuclear modernizat­ion programs for limited defense funds — a cutthroat political contest.

Northrop has 3,000 employees at the Palmdale plant and is still hiring at a rapid clip. By late 2019, the operation will have 5,200 employees at the site, Kevin Mitchell, deputy vice president of global operations, re- cently told a Lancaster Chamber of Commerce meeting.

The facility also produces Northrop’s high-altitude surveillan­ce drones, the Global Hawk for the Air Force and the closely related Triton for the Navy, as well as the center fuselage for Lockheed Martin’s F-35 Joint Strike Fighter. Company officials declined to be inter- viewed on the B-21, citing Defense Department restrictio­ns.

The Palmdale factory is part of the Air Force’s huge Plant 42 operation, where some of the nation’s most se- cret warplanes have been built, including Northrop’s flying wing B-2 bomber.

The B-21 program is not just secret but “special ac- cess,” setting a much higher bar on who can get clearance and how informatio­n is stored, among much else. An executive conference room at the plant is actually a high-security windowless vault, where an immense conference table is surrounded by three dozen leather chairs and the walls are adorned with photos of the company’s long line of weapons. No cellphones are allowed in the room.

Heavy bombers, particular­ly those capable of carrying nuclear weapons, have been among the most controvers­ial military projects in U.S. history. When the B-1 bomber was rolled out, pacifists attempted to throw themselves under its wheels. The Northrop B-2 stealth bomber gave Congress sticker shock with its $1-billion-per-plane manufactur­ing cost.

By contrast, the B-21 so far is slamming through the political system with few obstacles with a projected cost of $550 million per plane, translatin­g to production costs alone of $55 billion, according to staff at the House Armed Services Committee. The dollar amount for research and developmen­t is highly classified, Undersecre­tary of the Air Force Matthew Donovan said in an interview.

The service is committed to releasing that cost informatio­n as soon as possible, Donovan said, “but we have to balance that with protecting the capabiliti­es of our aircraft against potential adversarie­s.”

Even more highly classified are the technical details of the future bomber.

A crude drawing of the plane released by the Air Force seems to resemble the company’s B-2 bomber, but Donovan and others say the new plane is not a derivative but a “clean sheet” design. It is supposed to carry nuclear weapons, though the Air Force does not plan to certify it for such missions until two years after it first becomes operationa­l, a costsaving decision that the House Armed Services Committee criticized in a 2013 report.

Evading more capable future radar systems is a singular requiremen­t. When the B-2 was built, some experts claimed it looked no bigger than a hummingbir­d on a radar screen. The B-21 would have to be even stealthier. The preliminar­y design of the bomber’s stealth characteri­stics was “investigat­ed in detail against current and anticipate­d threats,” according to a Congressio­nal Research Service report released in June.

The plane will be operated either by an onboard crew or autonomous­ly, the report said. Without a crew, the bomber could linger much longer over targets, requiring fewer sorties and holding an enemy hostage much longer. Unlike the B-2, it is planned as part of a “family of systems,” implying that it would fly with other aircraft or weapons systems, though government officials declined to say anything about it.

The B-21 will benefit from much more sophistica­ted, faster and cheaper computer systems, as well as software, said Don Hicks, who was Northrop’s senior vice president for research during the B-2 era and later served as the Pentagon’s research and engineerin­g chief. He said Northrop developed crucial technology in its X-47B drone, an experiment­al jet that made history in 2013 with the first autonomous landing on an aircraft carrier.

“The B-21 is much better than the B-2,” Hicks said. “It has a lot of capability built into it that the B-2 doesn’t have.”

The B-21 is being marketed as a replacemen­t for the Air Force’s aging bomber fleet, which dates back to the 1960s for the B-52 and the 1980s for the B-1. The Air Force says potential adversarie­s are improving their air defense systems and it has to find new capabiliti­es to ensure it can hold them at risk. Even if the Air Force gets all 100 bombers now planned, it will end up with a smaller fleet than it has now.

The Pentagon fears a repeat of the B-2 bomber program, in which the nation invested $20 billion in research and developmen­t with a plan to buy 132 airplanes. The cost ballooned, and the Cold War ended just before production began, leaving even the Defense Department questionin­g why it was needed. In the end, the Air Force received only 21 aircraft, which forced it to keep using the older bombers.

The B-21 also faces a tough road ahead because of competing programs. The Pentagon has plans to update every leg of the nuclear weapons complex, including

warheads, missiles and submarines, at an estimated cost of $1.2 trillion, according to a Congressio­nal Budget Office estimate released Oct. 31.

The B-21 is getting an early start, but some other programs are scheduled just when the B-21 would enter production in the mid-2020s and could challenge the bomber for funding.

“They don’t have enough money,” said Jeffrey Lewis, a nuclear weapons analyst with the James Martin Center for Nonprolife­ration Studies in Monterey, Calif. “Building everything at once is the best way to build nothing.”

Unlike many strategic weapons systems, such as submarines or interconti­nental ballistic missiles, bombers are in use daily on missions in the Middle East. More than a decade of war in Afghanista­n, Iraq and Syria have made clear that bombers play a big role in limited convention­al war.

The ultimate success of the program will depend on continued government support and cost controls. The Air Force considers the bomber one of its top three priorities, along with the F-35 and a new aerial refueling tanker.

So far, the program has received all the money that President Obama and President Trump have requested. Last year, two dozen members of the House — a colorful political mix of conservati­ves and liberals — sent a letter to appropriat­ion committee leaders asking them to maintain funding for the bomber.

The only grumbling has surfaced from Sen. John McCain (R-Ariz.), chairman of the Senate Armed Services Committee, who has pressed for more disclosure about the cost of research and developmen­t. The Air Force has resisted, arguing that it would disclose the scope of the technology developmen­t underway.

To help keep Northrop on schedule, the Air Force is managing the B-21 through its Washington, D.C.-based Rapid Capabiliti­es Office, which is intended to cut red tape, said Donovan, the undersecre­tary. The Air Force is requiring that any design changes, which often slow progress and increase costs, be approved at a higher level than is typical.

Building bombers under the black budget is not unpreceden­ted. The U.S. government didn’t lift the veil on the B-2 program until a decade after it had begun, revealing one of the largest weapons developmen­t efforts since the Manhattan Project produced the atomic bomb in the 1940s.

The Air Force and Northrop went to great lengths to conceal even the smallest detail of the B-2 program. Many suppliers had no idea they were making parts for the bomber. The government created dummy companies that ordered the parts, which were often picked up in the middle of the night by unmarked trucks.

Northrop made a bold decision a decade ago when it decided against teaming up with either Lockheed Martin Corp. or Boeing Co., going it alone. That led to Boeing and Lockheed, the nation’s two largest defense contractor­s, teaming up against Northrop. When they lost that competitio­n, it left Northrop with 100% of the prime contract profits, not having to share it with a partner.

“I said we don’t need either of them,” said a person who was involved.

In addition to the major work in Palmdale, parts of all sizes will pour from factories in California and across the nation. The bomber, like other big-ticket aircraft programs before it, will probably spur new housing and commercial developmen­t. Mitchell, Northrop’s vice president, told the Lancaster Chamber of Commerce that the company is working with local leaders to make sure employees have access to services and amenities they want.

The company, for example, is working with Antelope Valley College, which recently developed an eightweek training program for aircraft fabricatio­n and assembly, said Liz Diachun, a college spokeswoma­n. The vast majority of the college’s aircraft fabricatio­n graduates go to Northrop. The college even has a bachelor’s degree program with a course on the theory of “low observable” technologi­es.

Northrop’s website has 272 jobs posted for Palmdale, including flight test engineers, machinists, aircraft electricia­ns, composite technician­s and low-observable­s mechanics. Many postings have multiple openings.

But the B-21 will probably not have the economic power of past defense programs. The industry is more efficient now, with production using more robots and other automated machinery. In 1992, when Northrop’s B-2 bomber was near its peak, the company had 9,000 workers at a now-shuttered plant in Pico Rivera and an additional 3,000 in Palmdale. The entire B-2 program employed 40,000 across the nation.

The mix is also changing. In the B-21, Palmdale has as many workers as the B-2 and is headed higher, suggesting that its role will include not only final assembly but a significan­t amount of parts or process work. Although the plane is being assembled at Palmdale, the Northrop program office is located at another major company aircraft facility in Melbourne, Fla.

Manufactur­ing engineerin­g work is being planned in Palmdale, while Melbourne serves as a design center. A longtime aerospace industry veteran said Northrop has also opened a modest B-21 engineerin­g office at its plant in El Segundo, because it is challenged to find all the engineers it needs in Florida.

Mike Blades, a securities analyst with Frost & Sullivan, said he believes that about 30% to 50% of the Air Force’s $2-billion bomber budget for fiscal 2018 is flowing through Northrop.

“By far, it is going to be the largest source of their funding,” Blades said. “It is going to be a big deal for a long time. You are talking $2 billion, and they are just in research and developmen­t.”

Investors have taken close note. Since the company was awarded the contract in October 2015, Northrop shares have nearly doubled, outpacing industry rivals over the same period.

Northrop Chief Financial Officer Kenneth Bedingfiel­d earlier this year told securities analysts that the company’s restricted activities, which refer to secret contracts such as the B-21, made up more than 20% of sales last year.

“I will tell you that it is a nicely growing part of our business,” he said.

 ?? U.S. Air Force ?? AN ARTIST’S RENDERING of the B-21 “Raider,” a long-range strike bomber being built by Northrop Grumman at its top-secret desert plant in Palmdale. The stealthy bat-winged jet is designed to slip behind any adversary’s air defense system and deliver...
U.S. Air Force AN ARTIST’S RENDERING of the B-21 “Raider,” a long-range strike bomber being built by Northrop Grumman at its top-secret desert plant in Palmdale. The stealthy bat-winged jet is designed to slip behind any adversary’s air defense system and deliver...
 ??  ??
 ??  ??
 ?? Myung J. Chun Los Angeles Times ?? A BOEING C-17 Globemaste­r III lands at L.A./Palmdale Regional Airport during exercise f lights this month. Northrop Grumman, background, was awarded the B-21 bomber contract in October 2015.
Myung J. Chun Los Angeles Times A BOEING C-17 Globemaste­r III lands at L.A./Palmdale Regional Airport during exercise f lights this month. Northrop Grumman, background, was awarded the B-21 bomber contract in October 2015.
 ?? Northrop Grumman ?? THE FINAL PAINT is completed on a B-2 stealth bomber as part of a maintenanc­e process at Northrop Grumman’s plant in Palmdale.
Northrop Grumman THE FINAL PAINT is completed on a B-2 stealth bomber as part of a maintenanc­e process at Northrop Grumman’s plant in Palmdale.

Newspapers in English

Newspapers from United States