Northwest Arkansas Democrat-Gazette
OIL AND GAS REPORT
The Arkansas Oil and Gas Commission last week issued 1 drilling permits, 1 well completions and 11 well recompletions. By county, they were:
DRILLING PERMITS
UNION — Great Lakes Chemical Corp. of El Dorado for Brine Supply Well No. 22S to TVD: 8,800 ft. and MD: 8,800 ft. in Smackover Form. of Catesville Fld. Loc. SHL: 842 ft. FSL & 230 ft. FEL of Sec. 22-19S-15W. Contractor: Reliance Well Service; work began Oct. 1.
WELL COMPLETIONS
UNION — Smackover Drilling Co. Inc. of Shreveport for Boorstin No. 1, 24-hr. prod. 9 bbls in Travis Peak Form. of Champagnolle Fld. Drilled to TD: 6,100 ft., perf.3,318-3,320 ft. of Sec. 10-17S-14W. Well Completetion done Aug. 2.
WELL RECOMPLETIONS
CLEBURNE — BHP Billiton Petroleum (Fay) of Houston for Joseph Giroir No. 9-11 1-23H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 9,274 ft., perf. 5,1799,169 OA ft. Loc. SHL: 266 ft. FSL & 1,181 ft. FWL and BHL: 490 ft. FNL & 579 ft. FWL of Sec. 23-9N-11W. Workover done Sept. 12.
BHP Billiton Petroleum (Fay) for Joseph Giroir No. 9-11 3-23H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 9,042 ft., perf. 4,960-8,935.5 OA ft. Loc. SHL: 266 ft. FSL & 1,251 ft. FWL and BHL: 482 ft. FNL & 1,160 ft. FWL of Sec. 23-9N11W. Workover done Sept. 12.
COLUMBIA — Columbia Oil Co. Inc. of Guy for Deltic Farm & Timber A No. 1, 24-hr. prod. 31 bbls in Smackover Form. of Atlanta Fld. Drilled to TD: 8,160 ft., perf. 8,155-8,157 ft. of Sec. 14-18S-19W. recompletion done July 31.
CONWAY — BHP Billiton Petroleum (Fay) for Merideth No. 7-16 1-2H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 10,469 ft., perf. 6,436-10,372 OA ft. Loc. SHL: 232 ft. FSL & 1,026 ft. FEL and BHL: 481 ft. FNL & 581 ft. FEL of Sec. 2-7N16W. Workover done Sept. 11.
BHP Billiton Petroleum (Fay) for Merideth No. 7-16 2-2H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 10,397 ft., perf. 6,260-10,299 OA ft. Loc. SHL: 278 ft. FSL & 1,072 ft. FEL and BHL: 489 ft. FNL & 1,159 ft. FEL of Sec. 2-7N-16W. Workover done Sept. 11.
BHP Billiton Petroleum (Fay) for Merideth No. 7-16 3-2H35, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 12,717 ft., perf. 6,635-12,577.8 OA ft. Loc. SHL: 368 ft. FSL & 1,121 ft. FEL and BHL: 1,462 ft. FSL & 1,721 ft. FEL of Sec. 2-7N-16W. Workover done Sept. 13.
FAULKNER — XTO Energy Inc. of Oklahoma City for McNair No. 3-3H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 10,096 ft., perf. 5,295-9,952 OA ft. Loc. SHL: 117 ft. FSL & 1,500 ft. FWL and BHL: 10 ft. FNL & 1,498 ft. FWL of Sec. 3-8N-11W. Workover done Sept. 9.
FRANKLIN — Riverfront Exploration of Fort Smith for John Hudson No. 1, 24-hr. prod. not available in Morris Form. of Aetna Fld. Drilled to TD: 9,150 ft., perf. 5,098-5,131 OA ft. Loc. 1,320 ft. FSL & 1,320 ft. FWL of Sec. 28-8N27W. Re-instate done Sept. 8.
LOGAN — Riverfront Exploration for Gulley No. 2-6, 24-hr. prod. not available in Middle Atoka Form. of B-44 Fld. Drilled to TD: 5,890 ft., perf. 3,0405,676 OA ft. Loc. 1,320 ft. FSL & 560 ft. FEL of Sec. 6-6N-26W. Re-instate done Sept. 8.
VAN BUREN — XTO Energy Inc. for Huie No. 10-14 2-15H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 3,596 ft., perf. 2,158-2,908 OA ft. Loc. SHL: 2,261 ft. FSL & 2,554 ft. FWL and BHL: 1,286 ft. FSL & 1,445 ft. FEL of Sec. 15-10N14W. Re-instate done Sept. 15.
WHITE — XTO Energy Inc. for Aaron Reynolds No. 1-28H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 9,845 ft., perf. 5,2859,222 OA ft. Loc. SHL: 200 ft. FSL & 30 ft. FEL and BHL: 19 ft. FNL & 665 ft. FEL of Sec. 28-8N-8W. Workover done Sept. 9.
ABBREVIATIONS
Loc. — location; Perf. — perforations; FEL — from the east line; FNL — from the north line; FSL — from the south line; FWL — from the west line; FEUL — from the east unit line; FWUL — from the west unit line; FNUL — from the north unit line; FSUL — from the south unit line; MCF — thousand cubic feet; bbl — barrel; MD — measured depth; TD — total depth; TVD — true vertical depth; PBTD — plug back total depth; BHL — bottom hole location; PBHL — proposed bottom hole location; SHL — surface hole location; OA — overall; N/A — not available.