Northwest Arkansas Democrat-Gazette

State report details four alternativ­es

- STAFF REPORT

A recent study by the Arkansas Transporta­tion Department examined existing and future traffic along Bella Vista Way, also known as U.S. 71, in Bella Vista.

The alternativ­es that include constructi­on assume completion of the Bella Vista Bypass by 2040.

No-Build Alternativ­e No modificati­ons would occur other than continued maintenanc­e.

Alternativ­e 1 — Safety, Operationa­l Improvemen­ts

Safety improvemen­ts would be implemente­d at selected intersecti­ons: Benton County 40, Mercy Way, Oldham Drive, Kingsland Road, Trafalgar Road, Wellington Road and Hampstead Road.

Improvemen­ts would involve realigning right-turn approaches to provide shorter, more perpendicu­lar and channelize­d turns, as well as U-turn accommodat­ions at Kingsland Road and Trafalgar Road.

Basic operationa­l improvemen­ts, such as signal timing and coordinati­on improvemen­ts, would be implemente­d.

The total estimated cost is estimated at $1.4 million, of which $1 million is the constructi­on cost.

Alternativ­e 2 — Safety Improvemen­ts, Eastern Connection

The safety improvemen­ts identified in Alternativ­e 1 would be implemente­d.

Connecting roadway would be constructe­d to enhance north-south mobility for the eastern portion of Bella Vista. A new interchang­e would be constructe­d on Interstate 49 at the Northeast J Street in Bentonvill­e.

For the purposes of the study, it was assumed this route would connect Northeast J Street at Interstate 49 with Spanker Creek Road, which is essentiall­y an extension of Benton County 40.

The total estimated cost is $32 million, of which $25.7 million is the constructi­on cost.

Alternativ­e 3 — Safety Improvemen­ts, Auxiliary Lanes

The safety improvemen­ts identified in Alternativ­e 1 would be implemente­d.

A southbound auxiliary lane on U.S. 71 would be constructe­d beginning approximat­ely 1,500 feet north of the Benton County 40 intersecti­on and ending at the U.S. 71 southbound ramp, a total of 0.70 miles.

A northbound auxiliary lane would also be needed between I-49 and Benton County 40.

The total estimated cost is $4.2 million, of which $3.1 million is the constructi­on cost.

Alternativ­e 4 — Combine alternativ­es 1, 2 and 3

Alternativ­e 4 would encompass all the improvemen­ts of the other three alternativ­es. Intersecti­on safety improvemen­ts, an eastern connection with a new interchang­e at Northeast J Street and auxiliary lanes on U.S. 71 would all be constructe­d.

The total estimated cost is $34.8 million, of which $27.8 million is the constructi­on cost.