Northwest Arkansas Democrat-Gazette

Zion Road project to begin after 14 years

- STACY RYBURN

FAYETTEVIL­LE — Work on Zion Road is about to begin after a 14-year delay.

The City Council on Tuesday OK’d a pair of contracts for constructi­on along the street from Vantage Drive to Crossover Road. One contract hires a design consultant to oversee the work at an hourly rate, up to $85,894. The other pays for the work itself, a $6.8 million contract with Tri Star Contractor­s in Siloam Springs.

The project requires relocating power and internet lines, and some of that work has been ongoing, City Engineer Chris Brown said. A significan­t amount of water and sewer line relocation

work also is required. That work is included in the constructi­on contract, he said.

Drivers should start noticing the work in about a month, Brown said. The project has a 17-month time frame.

The city included the project in its 2006 transporta­tion bond program. The stretch between College Avenue and Vantage Drive was completed in 2008. The recession hit around then, and city administra­tors prioritize­d getting as many other smaller transporta­tion projects done as they could because bid prices had gone down, Brown said.

The City Council gave the green light to finish Zion Road in 2013. Design work wrapped in 2015, but by then, the 2006 bond money had run out.

The 2019 bond referendum voters approved included $4.9 million to finish the project.

Close to $4.4 million is coming from the transporta­tion bond fund. Money for the water and sewer line relocation work is coming from the city’s capital fund for water and sewer projects. The cost is an additional $2.4 million.

Another $373,294 is coming from the transporta­tion fund to cover land acquisitio­n, extra design work, phase services, materials testing and any contingenc­y expenses. That brings the total budget for the project from the transporta­tion bond fund to nearly $4.8 million.

Zion is akin to an old country road, Brown said. Most of it has two lanes, deep ditches, no sidewalks or bicycle lanes and sharp curves. The grade goes up and down like a roller coaster, he said.

“Basically, we’re bringing lot of that section up to city standards,” he said.

Drivers can expect to see 10-foot-wide driving lanes in each direction with a 10-foot-wide center lane. A 6-foot-wide sidewalk separated from traffic will go on the south side, with a 10-footwide paved trail separated from traffic on the north side. Overall, the street will widen a few feet to 30 feet, Brown said.

The alignment will change, and grades will be flattened out, he said. A roundabout is planned at the intersecti­on with Old Missouri Road.

Constructi­on will happen in phases, meaning one lane in one direction will be closed at a time. Old Missouri serves as the only detour route between Vantage Drive and Crossover Road. About 10,000 cars per day travel that stretch, according to a map from the Arkansas Department of Transporta­tion.

Mayor Lioneld Jordan said improving Zion Road came up frequently during his time on the City Council from 2001-2008.

Justin Tennant, who served as council member for the northeast part of town from 2011-2018, said Zion Road is long overdue for an upgrade. He considered it a priority road project for his ward, but other projects and issues in the city ended up taking precedence, he said.

Tennant said he was riding as a passenger with his son driving recently and saw someone walking on the street, one foot in the asphalt, the other in a ditch.

“It’s so badly needed and has been for so long,” he said. “I’m thankful there haven’t been more accidents and injuries, not just from cars, but from people.” Stacy Ryburn can be reached by email at sryburn@nwadg.com or on Twitter @stacyrybur­n.

 ?? (NWA Democrat-Gazette/David Gottschalk) ?? Traffic moves along Wednesday on Zion Road near the intersecti­on of Randal Place in Fayettevil­le. The City Council on Tuesday approved constructi­on contracts to do improvemen­t work on the street from Vantage Drive to Crossover Road, a project that was originally included in the city’s 2006 bond improvemen­t program. Check out nwaonline.com/200727Dail­y/ and nwadg.com/photos for a photo gallery.
(NWA Democrat-Gazette/David Gottschalk) Traffic moves along Wednesday on Zion Road near the intersecti­on of Randal Place in Fayettevil­le. The City Council on Tuesday approved constructi­on contracts to do improvemen­t work on the street from Vantage Drive to Crossover Road, a project that was originally included in the city’s 2006 bond improvemen­t program. Check out nwaonline.com/200727Dail­y/ and nwadg.com/photos for a photo gallery.

Newspapers in English

Newspapers from United States