Pittsburgh Post-Gazette

Southwest sought more time for inspection­s

-

The Associated Press

DALLAS — Southwest Airlines sought more time last year to inspect jet-engine fan blades like the one that snapped off during one of its flights Tuesday in an accident that left a passenger dead.

The airline opposed a recommenda­tion by the engine manufactur­er to require ultrasonic inspection­s of certain fan blades within 12 months. Southwest said it needed more time, and it raised concern over the number of engines it would need to inspect. Other airlines also voiced objections.

It wasn’t until after Tuesday’s accident that the Federal Aviation Administra­tion announced that it will soon make the inspection­s mandatory. It is unclear how many planes will be affected by the FAA order. Airlines including Southwest say they have begun inspection­s anyway.

An engine on a Southwest jet exploded over Pennsylvan­ia on Tuesday, and debris hit the plane. Jennifer Riordan, a 43year-old bank executive from Albuquerqu­e, N.M., was sucked partway out of the jet when a window shattered. She died later from her injuries. The Boeing 737, bound from New York to Dallas with 149 people aboard, made an emergency landing in Philadelph­ia.

Investigat­ors said the blade that broke off mid-flight and triggered the fatal accident was showing signs of metal fatigue — microscopi­c cracks from repeated use.

The National Transporta­tion Safety Board also blamed metal fatigue for the engine failure on a Southwest plane in Florida in 2016 that was able to land safely.

That incident led manufactur­er CFM Internatio­nal, a joint venture of General Electric Co. and France’s Safran SA, to recommend in June 2017 that airlines conduct ultrasonic inspection­s of fan blades on many Boeing 737s.

In August, the FAA proposed making the recommenda­tion mandatory. The oldest blades would be inspected within six months, while many others would face an 18-month deadline. CFM commented that the longer deadline be shortened to 12 months.

During the public-comment period, which closed in October, Southwest and several other carriers raised objections. Southwest pushed back against CFM’s request for a 12month deadline, and American Airlines asked for even more time — 20 months.

The FAA never issued a final decision. A spokesman said the agency juggles dozens of rules simultaneo­usly, and the time to complete a final regulation varies based on many factors including complexity of the issue.

On Wednesday, the agency said it would issue a directive in the next two weeks to require the ultrasonic inspection­s of fan blades on some CFM56-7B engines after they reach a certain number of takeoffs and landings. Blades that fail inspection would need to be replaced.

Newspapers in English

Newspapers from United States