1. Hulton Road/Plum:
Closed through Aug. 9 between Eastern and Frankland avenues for roadway improvements. A 14-mile suggested detour will be posted.
2. Henderson Street/North Side: Alternating traffic during wall construction. Fountain Street closed between Shockoe Way and Henderson.
3. Saxonburg Road/Fawn, Harrison: Closed indefinitely between Route 908 and Freeport Road.
4. East Carson Street/Pittsburgh: Single-lane restrictions in both directions at various locations between the Smithfield Street Bridge and 33rd Street through December.
5. Noblestown Road/Oakdale, Pittsburgh: Closed between Hill and Gregg Station roads until further notice.
6. Dooker’s Hollow Bridge/ North Braddock, East Pittsburgh: Closed until December for replacement.
7. O’Connell Boulevard/North Braddock: Closed beneath the Dooker’s Hollow Bridge.
8. Way Hollow Road/Edgeworth, Sewickley Heights: Closed indefinitely between Woodland and Backbone roads. 9. Route 136/Elizabeth: Longterm closure between Route 51 in Forward and Long Hollow Road.
10. Evergreen Road/Millvale: Closed through mid-October between Klopfer and East Ohio streets.
11. Route 28/various locations: Work on the Route 28 Highland Park Bridge Interchange project means traffic disruptions in the entire area of the bridge through at least late August.
12. Mayview Road/South Fayette: Bridge over a branch of Chartiers Creek being replaced.
Part of Mayview between Boyce and Georgetown roads closed to through traffic.
13. Route 837/West Mifflin, Duquesne: Bridge preservation requires southbound traffic to be crossed over into the northbound lane between Harden Avenue and Kennywood parking Gate B through early August. 14. Freeport Road/Aspinwall: Lane restrictions 9 a.m.-3 p.m. Monday through Thursday until late August.
15. Elfinwild Road/Shaler: Singlealternating traffic 6 a.m.-6 p.m. daily through midAugust between Route 8 and Mount Royal Boulevard.
16. Allegheny Circle/Pittsburgh: Phase 2 of the Allegheny Circle Two-Way Conversion Project will last through the end of the year. Construction mostly Monday through Friday during daylight hours. Upcoming work includes closing a section of Sandusky Street and Stockton Avenue, as well as North Federal Street, starting Wednesday. The closures will be in place until late August or early September.
17. Neville Island Bridge/ Neville: Long-term closure of the ramp from Grand Avenue to northbound I-79 through midNovember. Right acceleration lane from the ramp to northbound I-79 on the bridge also closed.
18. Various locations/Pittsburgh: Seasonal milling and paving work. Full schedule available
at https://pittsburghpa.gov/domi/pavingschedule.
19. Larimer Avenue/Wilkins: Northbound lane between Thompson Street and McMasters Avenue closed through June 2022 for replacement of Thompson Run East Branch Bridge No. 2. The existing one-lane bridge, which carries Jones Avenue, remains open.
20. Fort Duquesne Boulevard/ Pittsburgh: Partial closure so the Pittsburgh Downtown Partnership can host events and activities to boost business in the Central Business District. In effect through Oct. 7.
21. Fifth and Forbes corridor/ Pittsburgh: Pittsburgh Water and Sewer Authority working on the Forbes and Fifth Water Main Replacement Project. Work to continue until spring 2022. Traffic
disruptions throughout the area.
22. Crescent Street, Mount Royal Boulevard/Etna, Shaler: Single-lane traffic 7 a.m.-7 p.m. daily through mid-August, Crescent Street between Kittanning Street and Grant Avenue; Grant Avenue between Crescent Street and Mount Royal Boulevard; Mount Royal Boulevard between Grant Avenue and Kenneth Drive.
23. Pearce Mill Road/McCandless: Traffic restrictions between Babcock Boulevard and Tennis Court Road in McCandless through December for widening of the road, installation of bicycle and pedestrian lanes within North Park, slope and drainage improvements, as well as milling and paving.
24. Little Sewickley Creek Road/Edgeworth, Leet: Closed through December for slide remediation between Sevin and Beaver roads.
25. Washington Road/Upper St. Clair, Bethel Park, Mt. Lebanon: Resurfacing between McMurray Road/McLaughlin Run Road and Connor Road/ Gilkinson Road means singlelane restrictions in various locations around the clock through May 2022.
26. Lincoln Highway/Findlay: Single-lane closures 9 a.m.-3 p.m. weekdays between Camp Meeting and Moody roads through late July for gas line replacement.
27. Bates Street/Pittsburgh:
Lane restriction southbound between between Hodge Street and Second Avenue through late July.
28. Potomac Avenue/Pittsburgh: Periodically closed 7 a.m.-4 p.m. weekdays and some Saturdays for Columbia Gas of Pennsylvania gas line replacement. Work to end sometime in July. Work area is between Banksville Road and Hillsview Terrace.
29. Wagner Street/Pittsburgh: Closed between Becks Run Road and Mountain Avenue for water line work through July. Detour via Becks Run Road, Brownsville Road, Ormsby Avenue and Walter Avenue.
30. Oporto Street/Pittsburgh: Closed indefinitely between Shamokin and Huron streets in the South Side Slopes neighborhood for landslide remediation.
31. Douglass Run Road/Elizabeth Township: Overnight shortterm traffic stoppages at the intersection of Nichols Hill Road through Sept. 15 so heavy-hauling vehicles can make turns into a work site, 6 a.m.-6 p.m.
32. Tarentum Bridge/Tarentum: Single-lane restrictions in each direction as needed from 9 a.m. to 3 p.m. weekdays through late September for lighting, signage, electrical and minor concrete work.
33. Ohio River Boulevard/Sewickley, Glen Osborne, Haysville, Glenfield: Single-lane restrictions in both directions of Route 65 between the Neville Island Bridge and Walnut Street in Sewickley from 7 p.m. to 6 a.m. Monday through Friday nights through June 2022 for improvement work. Additionally, daylight work may occur from 9 a.m. to 3 p.m. weekdays.
34. Route 51/Kennedy, Stowe, Robinson, Moon: Improvement work in the following locations:Fleming Avenue in Stowe to I-79 in Robinson (southern section), Thorn Run Road to Flaugherty Run Road in Moon (northern section) weekdays from 8 a.m. to 4 p.m. in the southern section and weeknights from 8 p.m. to 6 a.m. in the northern section. Work ongoing in the southern section; work in the northern section will begin in August. Lane restrictions.
35. Route 910/West Deer:
Bridge rehab work begins Tuesday between Middle Road and Oak Road. Traffic to be maintained in single lanes except for trucks.
36. Spring Run Road/Crescent: Closed in the 200 block to replace Spring Run Bridge No. 2. Work ends in November.
37. Fort Couch Road/Upper St. Clair and Bethel Park: Periodic single-lane closures between Washington Road in Upper St. Clair and Bethel Church Road in Bethel Park, 6 a.m. to 9 p.m. weekdays beginning Friday for repairs. Work to last about a month.
38. Boyds Run Road/Collier: Closed between Deer Hollow Drive and Thoms Run and Oakdale Road for slide-repair work through July 23. Detour posted. 39. Cochran Mill Road/Jefferson Hills: Closed until at least late this week between Wilson and Stilley roads because of storm damage.
40. Millers Run Road/South Fayette: Closed through Aug. 6 between Cuddy Lane and Morgan Hill Road for gas line relocation work. Through traffic will be detoured using Millers Run Road and Route 50.
41. Library Road/Bethel Park, Castle Shannon Borough: Singlealternating traffic between South Park Road and Mathilda Street, 8 p.m. to 6 a.m. Monday through Thursday nights; 8 p.m. to 10 a.m. Friday night into Saturday; 7 p.m. to 7 a.m. Saturday night into Sunday for paving and other improvement work.
42. Webster Avenue/Pittsburgh: Right lane eastbound between Chatham Street and Washington Place will close as needed from 7 a.m. until 5 p.m. Monday through Friday through Aug. 20. Contractor will pave new roadway associated with the CAP Project.
43. Fifth Avenue/Downtown Pittsburgh: Fully closed to traffic between Ross Street and Sixth Avenue and closed to vehicles and pedestrians between between Grant and Ross streets for manhole work associated with the Bus Rapid Transit Project. Work to continue through August.
44. Argonne Drive/Harrison: Periodic single-lane closures between Elm Street and Broadview Boulevard, 6 a.m. to 6 p.m. weekdays until September.
45. Camp Meeting Road/Bell Acres: Work to replace a culvert between Beech Ridge Drive and Fern Hollow Road to begin at 7 a.m. July 26 and last until October. The culvert is known locally as Little Sewickley Creek Bridge No. 7.
46. Streets Run Road/Baldwin, West Mifflin: Lane restrictions near Willock Avenue between Delwar Road and the railroad tracks; 7:30 a.m. until 5 p.m. Monday through Thursday for slide clearance.