Trump environmental rollback spurs mining near Okefenokee
SAVANNAH, Ga. — A mining company said Tuesday that it plans to dig for minerals without a federal permit at the edge of the vast wildlife refuge in the Okefenokee Swamp, a big step for a onceembattled project that’s now benefiting from the Trump administration’s rollback of environmental rules.
For more than a year, Twin Pines Minerals pursued a permit under the federal Clean Water Act to mine less than 4 miles ( 6.4 kilometers) from the home of the largest U.S. wildlife refuge east of the Mississippi River. Conservationists worry mining could cause irreparable harm to a fragile ecosystem that serves as a habitat for alligators, bald eagles and other protected species.
The Army Corps of Engineers, the agency handling the permit request, recently concluded most of the wetlands that would be drained or otherwise affected by the proposed mine are no longer protected under federal rules recently revised at the direction of the White House.
Twin Pines President Steve Ingle said in a statement Tuesday that his company is moving ahead with plans to mine on nearly 600 acres (243 hectares) near the Georgia-florida line.
“Because waters of the United States will not be affected,” Ingle said, “no federal permits will be required.”
Allowing the mining project to bypass federal permitting threatens “a conservation tragedy,” said Christian Hunt of the environmental group Defenders of Wildlife. Others called the decision an early consequence of a sweeping policy change that’s made waterways more vulnerable to pollution and destruction from development, industry and farms.
“These decisions are being made across the country, and we’re only starting to see the consequences,” said Greg Gisler, a senior attorney for the Southern Environmental Law Center. “I think what we’ll see over the next several months, until this rule is thrown out or changes, is that we’re going to lose the streams and wetlands that we depend on.”
In January, heads of the
Environmental Protection Agency and the Army Corps signed the policy change narrowing the types of waterways that qualify for federal protection under the halfcentury-old Clean Water Act.
President Donald Trump had long pushed for revision of Obama-era rules adopted in 2015, calling them overly burdensome on builders, industry and farmers. Environmental groups say the rollback allows pollution of now- unprotected waterways and destruction of some wetlands that serve vital functions filtering contaminants and providing buffers against flooding of adjacent uplands.
Twin Pines’ proposal to mine for titanium dioxide outside the Okefenokee National Wildlife Refuge caused an immediate outcry. The refuge covers nearly 630 square miles (1,631 square kilometers) near the Georgia- Florida state line. Its tea-colored waters, cypress forests and flooded prairies draw an estimated 600,000 visitors each year.
As the Army Corps weighed concerns from conservationists and government wildlife agencies, Twin Pines withdrew its application in February. A month later it submitted a new plan that significantly shrunk the project.
The nearly 600-acre footprint Twin Pines announced Tuesday is even smaller, less than half the size the company originally proposed.
The Army Corps reassessed certain wetlands at Twin Pines’ request after Trump’s new clean-water rules took effect in June. The agency confirmed Tuesday that, under the rules change, the tract would no longer require a federal permit.
“This property now has a large, contiguous, mineable area in the center of it because those wetlands have now been removed from our jurisdiction,” said Jason O’kane, regulatory chief for the Army Corps’ Savannah District, which handled the Twin Pines permit application.
The Fish and Wildlife Service said in a letter to the Army Corps a year ago that there was “great uncertainty” surrounding how mining near the swamp’s edge might affect its ability to hold water.
“The Service cannot de