Q: For months on Glades Road there have been orange barrels set up and nobody working, EVER! What is going on? Barbara Janower, Boca Raton. A: Most road constructi­on is done overnight to minimize traffic troubles so that is why you probably don’t see a lot of daytime activity.

There are two constructi­on projects on Glades Road. One involves the interchang­e with Florida’s Turnpike and the other stretches more than seven miles between State Road 7 and U.S. 1.

Paving on the turnpike interchang­e at Glades Road should be complete in the next several weeks, officials said.

Work on the rest of Glades Road includes repaving, installing guardrails, sidewalks, driveways, drainage improvemen­ts, signs, fiber optic cables, pedestrian crossing signals, mast arms for traffic signals, vehicle sensors, streetligh­ts, and pavement striping and markings.

All of that is expected to be done by the fall. Keep in mind asphalt must be paved at temperatur­es above 65 degrees, so cooler overnight weather can slow the pace, officials said.

Q: Does anyone know if there are plans for a traffic light at the intersecti­on of 178th Avenue and Pembroke Road? The intersecti­on is so dangerous and chaotic. Marie Modic, Miramar.

A: It looks like traffic signals are coming to that increasing­ly busy intersecti­on between Mir-

amar and Pembroke Pines.

The plans are 90 percent complete, according to the Broward County Public Works department.

The traffic lights will be mounted on hurricanes­trength, black metal mast arms complete with pedestrian crossing signals that beep and have countdown timers.

Plans include repaving the intersecti­on, as well. Constructi­on will begin sometime next year, officials said. Update: The $4.7 million, 2-year Ravenswood Road bridge replacemen­t and Dania Cut-Off Canal dredging project is finished.

It opened to vehicle and boat traffic earlier this month.