Solar plant fined $1.5M:

Solana exceeded pollution levels, didn’t conduct tests

- RYAN RANDAZZO

The Solana Generating Station west of Gila Bend has agreed to pay $1.5 million in fines for airquality violations that date back to 2014, according to the Maricopa County Air Quality Department.

The Solana Generating Station west of Gila Bend has agreed to pay $1.5 million in fines for air-quality violations that date back to 2014, according to the Maricopa County Air Quality Department.

Solana is a concentrat­ing solar plant that uses large, curved mirrors to focus sunlight on tubes of oil. The hot oil is used to make steam and spin turbines, generating about 250 megawatts of electricit­y.

The department said the plant’s 21 airquality violations include exceeding the pollution levels allowed by its permits, failure to conduct performanc­e tests as required and removing an emissions control system without approval.

Abengoa of Spain built the plant through an American subsidiary with a $1.45 billion federal loan and about $550 million in additional capital. The plant sells all of its electricit­y to Arizona Public Service Co. and the money from those sales is used to repay the federal loan.

That amount of power is enough to serve about 62,000 homes at once, and Solana can continue to make electricit­y for six hours past sunset by storing some of the heat. Traditiona­l black solar panels generate electricit­y only in sunlight.

But Solana has had operationa­l problems.

Records released Monday to The Arizona Republic related to the $1.5 million settlement reveal that equipment used to control oxides of nitrogen from being released to the atmosphere from the heating of molten salt was damaged in November 2014 and the plant did not complete a required test to show it was functionin­g.

They also show the plant exceeded the amount of water it was permitted to run through its cooling towers in the first half of 2015, and the company self-reported the violation.

The company also reported in 2014 it had exceeded the emission limit for its heat-transfer fluid for the preceding 12months by releasing 8,512 pounds of the fluid, 32 pounds more than its permit allowed. These issues follow previous troubles with the plant with the fluid, described as Terminol VP-1 in previous Maricopa County reports. In November 2014, the mildly toxic fluid was leaking from tanks, forming a small stream flowing into an open retention basin, according to the inspection report. The chemical can cause eye, skin and respirator­y irritation and can cause serious injury if inhaled in sufficient quantities.

Inspector Joseph Zumello reported at the time he could smell heat-transfer fluid throughout the site and observed it leaking from joints in the piping. He also wrote that a heat exchanger had overpressu­rized and exploded before the inspection.