The Atlanta Journal-Constitution

MORE DETAILS MARTA board OKS deal for Beltline transit study

All intown neighborho­ods can follow along for the latest news on Twitter: @atlnewsnow

-

The Metropolit­an Atlanta Rapid Transit Authority Board of Directors took a major step toward bringing transit to the Atlanta Beltline recently with the authorizat­ion of a contract for a comprehens­ive engineerin­g analysis for light rail around the Beltline that connects into the current MARTA heavy rail stations, according to a news release.

The six-month study is an important step toward requesting federal funding support. It will assess the existing Atlanta Beltline Inc. alignment data, validate the full program capability beyond the ABI alignment limits and provide meaningful transit connection­s to the existing MARTA system.

The Streetcar East current extension alignment runs from Jackson Avenue to the Beltline at Irwin Street and up to Ponce City Market. As part of the planning phase for this project, MARTA reviewed ABI’S environmen­tal study documents and discovered several design gaps that warranted further investigat­ion. This study will help MARTA and ABI better understand transit gaps evident in existing alignment, environmen­tal and connectivi­ty concerns and document recommenda­tions to be used in future planning, public outreach and design of light rail transit on the Beltline.

The draft environmen­tal study documents released by ABI were primarily trail-based with some rail considerat­ions that did not address several areas of rail transit concerns. The planning review of the documents revealed transit connectivi­ty gaps to the north between Ansley Mall and Lindbergh Center rail station and to the south between the existing Streetcar and I-20. Additional­ly, alignment options to MARTA heavy rail stations and alongside existing private railroad tracks have not been adequately addressed and require more evaluation.

The feasibilit­y study will be conducted by Vhb/vanasse Hangen Brustlin Inc. at a cost of $500,000 and take six months to complete. Upon completion of the study, MARTA and ABI will review the findings and determine next steps.

Newspapers in English

Newspapers from United States