The Saratogian (Saratoga, NY)

Hotels proposed for Washington St.

- By Joseph Phelan jphelan@digitalfir­stmedia.com

SARATOGA SPRINGS, N.Y. » A pair of proposed hotels may bring a total of 209 new rooms to the downtown.

The Rip Van Dam Hotel appeared in front of the Planning Board recently as Saratoga Springs Partners presented updated renderings, a summary to improve civic space and changes to the 7 Washington St. location.

The project sits before the board for a modificati­on to change the uses from a previous approval in 2014. The changes for the proposed six-story building include an increase in rooms from 142 to 159, a 2,900 squarefoot restaurant on the top floor and a removal of a banquet facility and an addition of a pool.

Moving forward, the Planning Board wants the applicant to receive further input from the city Design Review Commission regarding the mass and scale of the building overall, in particular in context of Washington Street as a whole, before coming back to the Planning Board.

Initially, the Adelphi Hotel & Spa, which is being proposed by Adelphi Hotel Partners at 19-23 Washington St., was scheduled to go before the Planning Board, but was pulled for a later date in order for the applicant to provide further materials related to the rear addition to the stone house currently on the site. The state’s Historic Preservati­on Office and

Saratoga Springs Preservati­on Foundation have asked questions on the merits of that portion of the structure.

According to site-plan on the city’s website, the proposed six-story hotel and spa would have 50 guest suites, operating independen­tly from the Adelphi Hotel, which is located at 365 Broadway. The proposal calls for the spa to be located on the basement level. The first floor calls for restrooms, a gym, a lounge, three small meeting rooms and a warming kitchen. The property was acquired from Bethesda Episcopal Church, which is located across the street, in 2014. The Stone House previously served as the church rectory.

The two hotels aren’t the only projects along Washington. The land-use boards approved two projects. One is for Bethesda Episcopal Church. The second is at Universal Preservati­on Hall at 25 Washington St., which is expected to cost $6.5 million. That project is expected to bring year-round entertainm­ent with Proctors to the site. The renovation­s include an elevator, a kitchen, a lobby area, new heating and air conditioni­ng as well as at least $500,000 worth of sound and acoustic equipment. The second floor will feature a performanc­e space that can seat about 700 people.

 ??  ?? This rendering shows a view of the proposed Rip Van Dam Hotel, which is to the left of the Starbucks.
This rendering shows a view of the proposed Rip Van Dam Hotel, which is to the left of the Starbucks.
 ?? JOSEPH PHELAN — JPHELAN@DIGITALFIR­STMEDIA.COM ?? The proposed Rip Van Dam hotel would be built Alongside Washington Street.
JOSEPH PHELAN — JPHELAN@DIGITALFIR­STMEDIA.COM The proposed Rip Van Dam hotel would be built Alongside Washington Street.

Newspapers in English

Newspapers from United States