The Times Herald (Norristown, PA)

Sources: Boeing changing Max software to use 2 computers

- By Tom Krisher

Boeing is working on new software for the 737 Max that will use a second flight control computer to make the system more reliable, solving a problem that surfaced in June with the grounded jet, two people briefed on the matter said Friday.

When finished, the new software will give Boeing a complete package for regulators to evaluate as the company tries to get the Max flying again, according to the people, who didn’t want to be identified because the new software hasn’t been publicly disclosed.

The Max was grounded worldwide after crashes in Indonesia and Ethiopia that killed a total of 346 people.

Use of the second redundant computer, reported Thursday by the Seattle Times, would resolve a problem discovered in theoretica­l problem simulation­s done by the Federal Aviation Administra­tion after the crashes. The simulation­s found an issue that could result in the plane’s nose pitching down. Pilots in testing either took too long to recover from the problem or could not do so, one of the people said.

In the new configurat­ion, both of the plane’s flight control computers would be monitored by software instead of the current one, and pilots would get a warning if the computers disagreed on altitude, air speed, and the angle of the wings relative to the air flow, the person said. Only one computer was used in the past, because Boeing was able to prove statistica­lly that its system was reliable, the person said.

The problem revealed in June is similar to the one implicated in the two crashes. That problem was with flight-control software called MCAS, which pushed the nose down based on faulty readings from one sensor. MCAS was installed on the planes as a measure to prevent aerodynami­c stalling, and initially it wasn’t disclosed to pilots.

The new software would make the entire flight-control system, including MCAS, rely on two computers rather than one, said the person. “It would make the whole flight control system more robust,” the person said.

Boeing Co. spokesman Charles Bickers said only that the company is working with the FAA and other regulators on software to fix the problem that surfaced in June.

 ?? AP PHOTO/TED S. WARREN, FILE ?? In this May 8 file photo, a worker stands near a Boeing 737 MAX 8 jetliner being built for American Airlines prior to a test flight in Renton, Wash.
AP PHOTO/TED S. WARREN, FILE In this May 8 file photo, a worker stands near a Boeing 737 MAX 8 jetliner being built for American Airlines prior to a test flight in Renton, Wash.

Newspapers in English

Newspapers from United States