• Route 1 (0/15) — Shoulder work from Old State Highway/ Mendocino County Line to Mill Street, Point Arena will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 15-minute delays.

• NEW: Route 1 (3.8/15.7) — Curve warning sign replacemen­t Collins Viaduct Bridge to Lake Street, Point Arena on Monday, Dec. 14. One-way traffic control will be in effect from 7 a.m. to 3 p.m. Anticipate 15-minute delays.

• COMPLETED: Route 1 (4.9/6.1) — AT&T was granted a Caltrans Encroachme­nt Permit for utility work from Road 8068 to Haven Neck Drive on Friday, Dec. 11.

• NEW: Route 1 (15.2/38.8) — Curve warning sign replacemen­t

from Main Street, Point Arena to Navarro Bluff Road on Tuesday, Dec.15. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Anticipate 15-minute delays.

• NE W: R o u te 1 (34.9/47.5) — Curve warning sign replacemen­t from North Limits Elk to Little River Airport Road on Tuesday and Wednesday, Dec. 15th and 16th. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Anticipate 15-minute delays.

• NEW: Route 1 (47.5/75) — Curve warning sign replacemen­t from Little River Airport Road to Blue Side Gulch beginning Tuesday, Dec. 15. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Anticipate 15-minute delays.

• NEW: Route 1 (62.1/62.8) — AT&T has been granted a Caltrans Encroachme­nt Permit for utility work from Pudding Creek to Airport Road beginning Thursday, Dec. 17. One-way traffic control will be in effect from 9 a.m. to 4 p.m. Anticipate 5-minute delays.

• Route 1 (75) — Emergency work at Blue Slide Gulch will continue. Oneway traffic control will be in effect. Anticipate 10-minute delays.

• COMPLETED: Route 1 (83.5) — Bridge work at Soldier Point Viaduct on Friday, Dec. 11. One-way traffic control will be in effect from 6 a.m. to 3 p.m. Anticipate 5-minute delays.

• Route 20 (16.5) — Slide removal two miles west of Three Chop Road will continue. One-way traffic control will be in effect. Anticipate 10-minute delays.

• Route 101 (0.6/2.4) — Core drilling from Geysers Road to Comminsky Station Viaduct on Thursday and Friday, Dec. 10 and 11. Lane closures will be in effect from 7 a.m. to 5 p.m. Anticipate minimal delays.

• NEW: Route 101 (3/5.9) — Drainage work from Comminsky Station Road to Pieta Creek Bridge will begin Friday, Dec. 11. Lane closures will be in effect. Anticipate 5- minute delays.

• Route 101 (51.7/53.7) — Emergency road repairs due to wildfire from Ryan Creek Road to the entrance to Witra’s Hidden will continue. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Anticipate 15-minute delays.

• Route 101 (76) — Emergency work 1.6 miles south of Rattlesnak­e Summit will continue. One-way traffic control will be in effect.

• Route 101 (95.8/96.5) — Emergency work near the Dora Creek Bridge will continue. Southbound lane closures will be in effect. Motorists should anticipate minor traffic delays.

• COMPLETED: Route 162 (7.1) — Bridge work at Bloody Run Creek Bridge on Friday, Dec. 11. Oneway traffic control will be in effect from 6 a.m. to 3 p. m. Anticipate 5-minute delays.

• Route 162 (8.2) — Core drilling at South Eel River Bridge will begin on Monday, Dec. 14. One-way traffic control will be in effect from 8 a. m. to 4:30 p. m. Anticipate 5- minute delays.

• COMPLETED: Route 162 (19.8/21.3) — Emergency work from Sand Bank Creek to Coal Mine on Friday, Dec.

11. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Anticipate 15-minute delays.

• NE W: Route 175 (3.1/3.9) — PG& E has been granted a Caltrans Encroachme­nt Permit for utility work from Pratt Ranch Road to Buckman Drive beginning Tuesday, Dec.

15. One-way traffic control will be in effect from 9 a.m. to 5 p.m. Anticipate 5-minute delays.