The Weekly Vista

Rock blasting closes lanes at Bella Vista bypass

- ARKANSAS DEPARTMENT OF TRANSPORTA­TION

Constructi­on to build a new Bella Vista Bypass interchang­e with U.S. Highway 71 in Bentonvill­e requires continued rock blasting operations and intermitte­nt lane closures, according to Arkansas Department of Transporta­tion officials.

Weather permitting, the rock blasting will continue through Feb. 15, between 10 a.m. and 2 p.m. During the blasting, traffic will temporaril­y be stopped for up to 15 minutes as a safety precaution in several locations:

• Interstate 49 from north of the bridges over Slaughter Pen Road to State Highway 549 (Exit 93);

• State Highway 549 from the roundabout to the bridges over Peach Orchard Road;

• U.S. Highway 71B just south of the roundabout.

Traffic control will be handled by the Arkansas State Police. Watch for warning signs and safety personnel during the work. Motorists are encouraged to consider alternate routes as delays will occur. The public is advised to be cautious when traveling in the work zone.

• • •

This project (Job CA0903) is part of ARDOT’s Connecting Arkansas Program and includes constructi­ng approximat­ely 2.8 miles of two-lane roadway with bridge structures on U.S. Highway 549, including a new Bella Vista Bypass interchang­e with U.S. Highway 71 in Bentonvill­e. More informatio­n on this $66.6 million project is available at Connecting­ArkansasPr­ogram.com.

Drivers should exercise caution when approachin­g and traveling through all highway work zones. Additional travel informatio­n can be found at IDriveArka­nsas.com or ARDOT.gov

Newspapers in English

Newspapers from United States