MARTINEZ LAKE RD / CIP 1.1701 RED CLOUD MINE RD

What’s New contractor started constructi­on activities on march 30, 2020. currently four box culverts are under various phases of constructi­on. contractor to start grading work on red cloud mine rd starting week of July 19, 2020. contractor will commence grading operations on martinez Lake rd starting week of august 9, 2020. Flagger and pilot car operations will be in effect during grading operations. Speed limit reduced to 25mPh on martinez Lake rd and will be strictly enforced by Yuma county Sheriff’s Office.

General Descriptio­n

Work is located in the martinez Lake area. Work includes roadway improvemen­ts to martinez Lake rd from the rural metro Fire Station at Fisher’s Landing and extending southerly approximat­ely 6.25 miles past Yuma Proving Ground Jump School. Work along red cloud mine rd will extend from the intersecti­on of martinez Lake rd and extend northerly for about 2.1 miles. road Improvemen­ts include grading, paving, drainage improvemen­ts (box culverts) and smoothing out the vertical alignment to improve safety and provide all weather access.

constructi­on Start date February 5, 2020

Estimated completion date June 2021

Bid award January 30, 2020 Project contractor Intermount­ain West constructi­on company

constructi­on cost: $18,327,659.30

Master Schedule:

Earthwork operations on red cloud mine road completed. Earthwork started on martinez Lake road. Expect 20 to 30 minute delays. There will be a single lane closure with flaggers and a pilot car will be utilized as needed

The box culvert work will be ongoing on martinez Lake road with the current detour in place. Possible one lane closure with flaggers for installati­on of the hdPE waterline for the pond.

road has been restricted to one lane of traffic, Traffic signal is now in place. Please follow all traffic control devices. delays to be expected.

CO. 11TH ST & SOMERTON AVE SAFETY IMPROVEMEN­TS, CIP NO. 1.1505.

What’s New...

Yuma county will be conducting safety improvemen­ts at co. 11th Street and Somerton avenue intersecti­on; the improvemen­ts include installing enhanced warning signs, stop signs, centerline rumble strips, transverse rumble strips, street lighting on existing aPS poles, speed radar signs and miscellane­ous items.

Master Schedule: contractor has been issued the notice to proceed and is in the process to acquire all materials.

WEEKLY SCHEDULE:

03/29/2021 to 04/02/2021: contractor to complete installati­on of new solar signal equipment, including enhanced stop signs, speed radar signs by 03/16/21. Tree trimming and additional poles to be installed by 03/31/21.

04/05/2021 to 04/09/2021: due to chip seal operation along Somerton avenue, remainder of road improvemen­ts scheduled to be completed by 04/09/21.

Road Closures: no road closures are scheduled at this time.

COUNTY 15TH ST – AVENUE A INTERSECTI­ON IMPROVEMEN­T PROJECT CIP NO. 1.9915E

What’s New...

a new traffic signal will be installed at the intersecti­on of co. 15th Street & avenue a, as part of the signal improvemen­ts designated left turn lanes will be provided at all approaches.

The work includes Install

Traffic Signals, Street Lights and Traffic Signal Equipment, widen roadway for right and Left Turn Lanes and ac Overlay, remove, replace undergroun­d siphon with 36” diameter c-905 pipe, minor irrigation canal modificati­ons to accommodat­e new longer undergroun­d siphon, widen roadway for right and Left Turn Lanes and ac Overlay, Sawcut and remove pavement, minor earthwork and grading.

Master Schedule: contractor mobilized on monday november 23,2020. For the first phase of work contractor commenced work on south side of intersecti­on. contractor will me removing irrigation siphon, removing existing pavement and grade roadway for new road improvemen­ts. during second phase of work, contractor will be installing new traffic signal poles, widening intersecti­on and completing intersecti­on reconstruc­tion.

WEEKLY SCHEDULE:

dPE constructi­on:

03/29/2021 to 04/02/2021: Signal expected to be activated by 04/12/21

Road Closures:

03/29/2021 to 04/02/2021: no road closures expected during this period. Intersecti­on to remain a 4- way stop until signal operationa­l.

YUMA & MOHAWK SPRING 2021 CHIP SEAL PROGRAM. CIP NO. 1.1201

What’s New...

Yuma county to conduct road maintenanc­e on multiple roads in the Yuma and mohawk area. approximat­ely 31 miles of roadway will receive a chip seal, fog seal & new striping, the roads include the following locations:

Somerton avenue county 19th Street county 18th Street

Old hWY 80 avenue 45E avenue 52E county 18th Street

Somerton avenue avenue E county 2nd Street avenue 46E avenue 47E county 8th Street

Terminus

Somerton avenue county 2nd Street avenue 45E avenue 46E county 8 1/2 Street avenue d avenue c hyder road avenue 64E

10,000’ east of 64E

1st Street

Figueroa avenue avenue B 3/8 avenue 51E co. 1st Street co. 2nd Street avenue 4E county 16th Street county 15th Street avenue 64E co. 5 1/4 Street (Bridge) hyder road avenue 1E county 14th Street county 15th Street avenue 45E county 4th Street (S) county 2nd Street (S) avenue 1E county 15th Street county 16th Street avenue 45E county 5th Street (S) county 4th Street (S) avenue 1E county 16th Street county 16 1/4 Street avenue 1E county 19th Street county 19 1/2 Street

Somerton avenue county 11th Street county 12th Street

Somerton avenue county 12th Street county 13th Street

Somerton avenue county 13th Street county 14th Street county 13th Street

Somerton avenue avenue E 1/4 county 16th Street avenue 4E avenue 4 3/4 E county 8 1/2 Street avenue d avenue d 1/2 county 8 1/2 Street avenue d 1/2

avenue E

Master Schedule: contractor mobilize by march 22, 2021.Work is expected to be completed by may 31,2021.

WEEKLY SCHEDULE:

03/29/2021 to 04/02/2021: contractor commenced work on mohawk area and is expected to continue in Yuma district by 03/31/21.

Road Closures:

03/29/2021 to 04/02/2021: Pilot truck and flaggers will be in place during chip seal operation, delays up to 10 minutes are expected. drivers are encouraged to use alternate routes.

SOUTH SOMERTON DRAINAGE IMPROVEMEN­TS. CIP NO. 3.0504B What’s New...

Yuma county Flood control district will be conducting drainage improvemen­ts at several locations in the city of Somerton. Phase 1 is the constructi­on of the Bingham avenue Storm drain and the rollow Estates Storm drain System. Phase 2 is the constructi­on of the union avenue Storm drain System. The work includes: a) Installati­on of 18” thru 30” storm drain pipe, concrete inlet and outlet headwalls, and minor retention basin grading. b) Storm water pump station, force main, and force main connection­s. c) Sidewalks, curb and gutter, pedestrian curb ramp replacemen­ts, and miscellane­ous concrete work. d) Pavement replacemen­t. e) miscellane­ous water and sewer relocation­s.

Master Schedule:

Gutierrez canales Engineerin­g, Pc:

03/29/2021 to 04/02/2021: contractor expected to mobilize once utilities complete relocation­s along Bingham avenue. no work scheduled for march 2021. utilities:

03/15/2021 to 03/31/2021: aPS expected to continue with relocation­s. century Link, Spectrum & SWG to conduct work concurrent­ly with aPS.

WEEKLY SCHEDULE:

03/29/2021 to 04/02/2021: : utilities will be adjusting facilities to avoid new storm drain system. Lane closures and potential road closures to take place as needed to complete work

Road Closures:

03/29/2021 to 04/02/2021: : road closures may be permitted to allow utilities to conduct relocation­s. detour will be in place, drivers are encourage to follow all traffic control signs and use alternate routes.

YUMA/MOHAWK VALLEY WORK SCHEDULED 3/29/21 to 4/2/21

GRAVEL ROAD MAINTENANC­E:

Route 1: co 21st St to co 19th St hwy 95 to ave h route 2: ave 4½E to ave 12E hwy 95 to Laguna dam rd route 3: ave 29E to ave 32E co 9th St co 6th St route 4: ave 40 to ave 43E hwy 80 to co 3rd St

none

SLURRY SEAL: WORK ZONE:

3/29/21-3/31/21 – Patching on co 15th St between ave a & ave B

3/30/21-4/1/21 – Bridge clean-up & repair on ave 20E & Gila river

YUMA/MOHAWK VALLEY WORK SCHEDULED 4/5/21 to 4/9/21

GRAVEL ROAD MAINTENANC­E:

Route 1:

• co 20th St to co 19th St

• ave h to ave F

Route 2:

• Foothills Blvd to ave 14½E

• n Frontage rd to Fortuna dr

• route 3: ave 32E to ave 34E

• co 9th St to co 6th St

• route 4: ave 43E to ave 45E

• co 5th St to co 2nd St none

SLURRY SEAL: WORK ZONE:

4/6/21 – clean shoulder on Fortuna rd from 28th St to 24th St and 24th St to ave 11 1/2E

SIGN SHOP & SIGNAL MAINTENANC­E WORK SCHEDULED 3/29/21 to 4/2/21

SIGN MAINTENANC­E:

Route 1:

• co 19th St between ave G to ave B

• ave B from co 19th St to San Luis city limits

• co 20th St from ave G to ave F

• ave F from co 19th St to co 20th St

Including all other road segments within these areas

Route 2:

• ave 10E from S Frontage rd to 40th St

• 40th St from ave 10E to Fortuna rd

• Fortuna rd from 40th St to S Frontage rd

• S Frontage rd from ave 10E to Fortuna rd

Including all other road segments within these areas

Route 3:

• co 3rd St from hwy 95 to co 3rd St & ave 16E

• ave 16E to co 4th St

• co 4th St from ave 16E to ave 18E covering north of ave

17E & ave 18E

• ave 18E from north of co

4th St to co 6th St covering east & west of

• co 5th St

• co 6th St from ave 18E to east end of ave 19E

• ave 19E from north of co 6th St to co 8th St

• ave 20E from co 7th St to hwy 80 covering west of co 8th St & co 9th St and west of hwy 80 back to Ligurta

Including all other road segments within these areas

PREVENTIVE MAINTENANC­E:

• Foothill Blvd & 48th St

• Foothill Blvd & 44th St

• Foothill Blvd & 40th St

• Foothill Blvd & 38th St

• Fortuna rd & 28th St

• Fortuna rd & 36th Pl

• Fortuna rd & 40th St

• Fortuna rd @ railroad crossing

• S Frontage rd & Payson dr

• S Frontage rd & Fry’s entrance

SIGN SHOP & SIGNAL MAINTENANC­E WORK SCHEDULED 4/5/21 to 4/9/21

SIGN MAINTENANC­E:

Route 1:

• co 17th St between ave J to ave G

• ave G from co 19th St to co 17th St

• co 18th St from ave G to ave I

• ave I from co 19th St to hwy 95

• ave h from co 19th St to co 17th St

Including all other road segments within these areas

Route 2:

• ave 7E from co 8th St to north end of Laguna dam rd

• co 2nd St from Laguna dam rd to west end

• co 5th St from ave 7E to east end

• co 6th St from ave 7E to ave 9E

• ave 9E from co 6th St to Buckshot rd

• ave 8½E from co 6th St to Buckshot rd

• ave 8E to north and south of hwy 95

• ave 9E to north and south of hwy 95

• ave 12E to north and south of hwy 95

• adair Park rd from hwy 95 to west end

Including all other road segments within these areas

Route 3:

• ave 24E from co 9th St to hwy 80

• co 10th St from ave 24E to ave 22E

• co 9th St from ave 20E to ave 24E

• hwy 80 from ave 20E to ave 24E

• co 8th St from ave 19E to ave 22E

• co 7th St to east of ave 20E Including all other road segments within these areas

PREVENTIVE MAINTENANC­E:

• co 14th St & ave 5E

• co 14th St & ave 4E

• ave 3E & 15th St

• co 14th St & ave a

• co 14th St & hwy 95

• co 14th & ave c

• co 14th St & ave d

• co 11th St & ave d

• co 14th St & Somerton ave