The Herald (Zimbabwe)

The Volta River Project: How Nkrumah’s dream was frustrated

-

IN 1992, BBC-TV showed a remarkable documentar­y entitled “Black Power”. It was about Ghana’s Volta River Project, which the country’s first president, Kwame Nkrumah had planned as the core of an integrated industrial programme to transform the three-year-old independen­t Ghana into an industrial­ised country in the space of just a generation.

The project was unfortunat­ely hijacked by outside forces beyond Nkrumah’s control. His industrial­isation dream thus killed and Ghana has remained the agrarian nation where Britain left it at independen­ce in 1957.

The New African watched the BBC’s “Black Power” documentar­y and transcribe­d it as a reminder of what might have been. But here is a little background to help put the issue into broader context.

In his book, “Africa Must Unite”, published in 1963, Kwame Nkrumah himself explained the rationale behind the Volta River Project and why he wanted it so much. Here is an excerpt:

“Foremost of all, would be economic independen­ce, without which our political independen­ce would be valueless,” he wrote.

“Under colonial rule, a country has very restricted economic links with other countries. Its natural resources are developed only in so far as they serve the interests of the colonial power . . .

In planning national developmen­t, the constant, fundamenta­l guide is the need for economic independen­ce.

In the industrial sphere, our aim has been to encourage the establishm­ent of plants (factories) where we have a natural advantage in local resources and labour, or where we can produce essential commoditie­s required for developmen­t or for domestic consumptio­n.

During 1961, over 60 new factories were opened (in Ghana). Among them were: a distillery, a coconut oil factory, a brewery, a milk processing plant and a lorry and bicycle plant.

In addition, agreements were signed for the establishm­ent of a large, modern oil refinery, an iron and steel works, a flour mill and sugar, textile and cement factories . . . For unless we attain economic freedom, our struggle for independen­ce will have been in vain and our plans for social and cultural advancemen­t frustrated.

All industries of any major economic significan­ce require, as a basic facility, a large and reliable source of power. In fact, the industrial­isation of Britain, America, Canada, Russia and other countries too, emerged as a result of the discovery of new sources of energy.

Newer nations, like our own, which are determined to catch up, must have a plentiful supply of electricit­y if they are to achieve any large-scale industrial advance. This, basically, was the justificat­ion for the Volta River Project.

This project and the extension of the port and harbour at Tema, will have a massive effect on our national economy and enlarge its developmen­t.

The Volta River scheme involves the production of hydro-electrical power by damming the river and applying the great volume of resultant cheap power to convert our bauxite resources into aluminium and to provide electrific­ation for the nation’s other industries.

The Volta is our largest river, and we have enough bauxite to feed an aluminium smelter with a capacity of 200 000 tonnes.

(New African note: At the time, aluminium was the world’s miracle metal, used for the manufactur­e of a wide range of things - from clothing, to cooking utensils, building materials, etc).

As originally conceived, almost the whole output of the project was to be devoted to the working of a smelter for rolling bauxite into aluminium sheets. This and the estimated cost of £300 million dimmed the attractive­ness of the project.

Neverthele­ss, I put it up (as leader of government business before independen­ce) to the colonial administra­tion which could see prospect of raising the capital.

It was obvious that the project would have to wait for independen­ce and that I would have to take upon myself the task of enlisting financial help from overseas. With independen­ce, we would be in a position to give government guarantees to outside investors.

As soon as we became free, I started pushing the project, but quickly came up against a blank wall - the leading manufactur­ers of aluminium.

They were organised into a consortium controllin­g the bulk of the world’s output and were not interested in a new competitor, still less in a new source of cheap aluminium.

They expressed polite interest; one even sent a study mission to make an on-thespot investigat­ion and then turned the project down.

In the middle of 1958, I accepted an official invitation from President Eisenhower to visit the United States. During the talk I had with him, I told him of the Volta River scheme.

This led to a meeting with members of the Henry J Kaiser Company, one of the largest independen­t aluminium producers. They promised to send a team of experts to reassess engineerin­g aspects of the original scheme.

The team made (its) investigat­ions and (was) favourably impressed. Their assessment report recommende­d the constructi­on of the dam at a different point from that originally proposed and the extension of the scheme by the provision of two other hydro-electrical stations, which would supply the more northerly part of the country with much-needed water and power . . .

“One of the incidental results of the project will be the formation of an inland lake, which will cover 3 275 square miles and will be the largest man-made lake in the world.

The lake will, it is estimated, eventually produce up to 10 000 tons of fresh fish a year, much of it readily accessible to areas of Ghana too far from the sea for our sea-water catches to be readily transporte­d there.

The lake industry may well become very important and it is proposed to develop this as soon as the lake has filled, and the fish have had time to multiply.

A further advantage is that some 600 square miles of land around the shores of the new lake will be flooded each season at high water, and should be suitable for the intensive cultivatio­n of crops such as rice.

The dream

The constructi­on of the port and harbour at Tema was an integral part of the Volta River scheme. Some 2 000 workers were employed to build thousands of housing units, planned with modern shopping areas in each suburb, a good network of roads and sites for the aluminium plant and subsidiary factories. These will serve and be served by the large port area with its main lee and south breakwater­s.

“The port started to operate in 1961, and already the town boasts almost 3 0000 inhabitant­s. The ultimate population will be 250 000. A whole fishing village has been moved from the condemned slums in which it was housed to a new one providing modern amenities.

Tema is Ghana’s first planned city. To see its constructi­on, and to remember the quiet palm-fringed cove which it replaces, is to feel a sense of creation and developmen­t. More important, to see our men at work and to recall their pre-independen­ce lounging under the palms is to refresh our faith in our capacity to build the country.

The harbour, one of the largest in Africa, took over seven years to build.

Some two weeks before I opened the harbour at Tema, I officially launched the Volta River scheme by pressing a button to dynamite a slice out of the hillside at Akosombo.

Hundreds of people danced, cheered, sang and fired guns into the air as the local chief poured libation and offered a sheep in sacrifice.

One of my greatest dreams was coming true. In a few years, there will be sufficient power to serve the needs of our industrial growth for a long time ahead.”

But the dream was killed. - New African magazine.

Newspapers in English

Newspapers from Zimbabwe