Fixed, Fitted & Furnished
Want to know what made the spec’ schedule for all our featured projects? Don’t worry, we’ve got you covered...
Aman Kyoto
Client Kyoto Resorts Co., Ltd Design Consultant Kerry
Hill Architects
Project Principals Kerry Hill, Justin Hill, Angelo Kriziotis Project Architect Henry Sauerbier
Project Interior Designer Isabelle Vergnaud
Project Team Yvette Adams, Alan Bajamundi, Simon Cundy, Paul Empson, Sulaini Jonied, Patrick Kosky, Ken Lim, Michael Na, Mario Neves, Alex Ong, Benjamin Smestad, Alicia Worthington Local Architect Toyo Architects & Engineers Office Mechanical Engineer PAC Kankyo-Mode Inc.
Structural Engineer Toyo Architects & Engineers
Office
Landscape Architect Design and Management Inc. Lighting Designer MUSE-D Co. Ltd
Kitchen Consultant Cini-Little Japan Inc.
Signage Bikosha Inc. Contractor Shimizu Corporation
Hotel Operator AMAN
Time To Complete 36 months (construction)
Internal Area 4,824 sqm Kerry Hill Architects kerryhillarchitects.com Toyo Architects & Engineers Office toyosekkei.co.jp
Finishes
Internal veneer panels and timber flooring, Japanese tamo (ash). Guest room bathroom, hinoki timber. External doors and battens, dark-stained Japanese cedar.
Fixed & Fitted
WCs, TOTO. Tapware, Vola. Sinks, Kohler.
Lighting
Custom fixtures throughout.
Furniture
Outdoor furniture, Kettal.
Geijoeng Concept Store
Client Geijoeng
Design Consultant Studio 10 Principal In Charge Shi Zhou Project Team Cristina Moreno Cabello, An Huang, Chunhui Mo, Zixia Huang, Yue Yu, Feifei Chen,
Jiaxiao Bao
M&E Engineer Lin Chen Builder Ningtuo Furnishings
Time To Complete 2 months Total Floor Area 120 sqm Studio 10 studio10.co
Finishes
Custom-made terrazzo flooring, 后象有品. In fitting rooms, green velour curtains, Kvadrat.
Lighting
Track lighting, Viabizzuno.
Yi by Jereme Leung for Raffles Hotel
Client Katara Hospitality Designer Aedas Interiors Project Team Simon Thompson, Ji An,
Susan Abraham, Teresa Evangelista
Lighting Designer Project Lighting Design
C&S Engineer Beca
M&E Engineer Beca
Quantity Surveyor RLB Builder Yang Ah Kang & Sons
Time To Complete 18 months Total Floor Area 594 sqm Aedas Interiors aedas.com
Finishes
In main dining and private dining room, customdesigned hand-tufted carpet,
Royal Thai. In main dining, feature wall covering is ‘Garden of Hours’ 3D printed on gilded silk, Fromental. In main dining, wall-panelling upholstery is ‘The Crane’, Florence Broadhurst Collection, Bode. In main dining, private dining room and experience room, ‘Frassino Oak’ wood parquetry flooring, WOW
(World of Wood). In main dining, wall cladding is carved Calacatta marble with linear grooves, Polystone.
Lighting
In main dining, custommade ceramic pendant light fixtures, Einc. In private dining room, custom-made chandelier, Plaza Crystal & Furniture.
Furniture
In entrance foyer, main dining and private dining rooms, all furniture is custom designed and custom made, Yang Ah Kang & Sons.
Artworks
At entrance foyer, ‘Pale Garden’ mixed-media installation, Moss & Lam.
In main dining, custom plaster ceiling sculpture, ID Products.
SKP_S
Client SKP
Project Team SKP, SYBARITE, Gentle Monster Architect SYBARITE Interior Designer Gentle Monster with SYBARITE Landscape Architect SYBARITE
Lighting Designer (Facade) Speirs and Major
Lighting Designer (Interiors) Light iQ + Studio Illumine M&E Engineer ARUP MEP Facade Consultant ARUP Facade
Specialist Engineer Eckersley O’Callaghan
Time To Complete 16 months Total Floor Area 19,000 sqm
Gentle Monster
gentlemonster.com
SYBARITE
sybarite.com
A Simple Headquarters
Client Wearnes Automotive Pte Ltd
Design Consultant
Pencil Office
Lead Design Consultant Erik L’Heureux FAIA Design Consultant Team
Ng Sze Wee, Angelia Lau, Yang Han
Architect of Record TEAM DESIGN Architects Pte Ltd Lighting Designer
Light Collab LLP
C&S Engineer
Case Consultants
M&E Engineer TritonT Consulting LLP
Quantity Surveyor YSCA Consultancy Pte Ltd Builder DECON Builders Pte Ltd
Facade Archilite
Interior Contractor Ngai Chin Construction Pte Ltd
Time To Complete 24 months (envelope and interior)
Total Floor Area
18,641.52 sqm
Pencil Office
penciloffice.com
TEAM DESIGN Architects Pte Ltd
teamdesign.com.sg
Finishes
In corporate office, homogeneous tiles, Hafary
Holdings. In lounge and executive offices, whitewash oak veneer, Merawood
Industries. At verandah and phone booths, ‘Tiger’ leather, Veranda. In corporate office, ‘Tie Dye’, ‘Noble Materials’ and ‘A Walk in the Garden’ carpet tiles, SHAW Industries Group. In corporate office, Vescom ‘Hauki’ and Texdecor wallcoverings, Xessex. In corporate office, window blinds, Estil Furnishing. In locker room and staff lounge, ‘Lincoln Walnut’ and ‘Oak’ laminate, Lamitak.
Fixed & Fitted
In staff lounge, ‘Blanco Zerox’ sink and faucet, Sheano.
Lighting
In lounge, custom-made wall and pendant lamps,
E-lume. In corporate office and on building exterior, downlights and architectural lights sourced by Light Collab.
Furniture
In lounge, custom-made chairs, Hemisphere Design.
In lounge and executive offices, custom-made tables, Marquis Furniture
Gallery. In executive offices, Herman Miller ‘Aeron Chair’, Xtra Office.
Samsen STREET Hotel
Client L.S. Hotels &
Resorts Group
Designer CHAT architects Project Team Chatpong Chuenrudeemol, Prueksakun Kornudom, Natthapakorn Kapukum, Karn Chuensriswang Landscape Architect CHAT architects
Interior Design and Environmental Graphics CHAT architects
Lighting Designer Gooodlux Design Consultancy
M&E Engineer Nuttanon Pongpanit
Time To Complete
2 years 4 months
Total Floor Area 2,560 sqm
CHAT architects
facebook.com/ chatarchitects
Finishes
Exterior and interior, polished concrete plaster, painted plaster and painted steel. Interior, wood vinyl flooring (guest rooms), epoxy flooring (corridors), cement antique floor tiles (restaurant).
The Quiet Room
Client National Museum of Singapore
Architect Lekker Architects Pte Ltd
Project Team Ong KerShing, Joshua Comaroff, Chen Shunann, Emiline Elangovan, Ivy Cruz,
Lim Yi De, Lua Jin Wei
Light Programming Torene Project / Tony Tan
Builder AE Models Team
Pte Ltd / KC Lee
Time To Complete 3.5 months Total Floor Area 25 sqm
Lekker Architects Pte Ltd
lekker.sg
Finishes
In ‘womb’ room, stretched membrane ceiling, Cosa
International. In all areas, LG Hausys ‘Medistep Origin’ vinyl flooring.
Furniture
On cushions and floor padding in ‘womb’ room,
Cotting ‘Michigan’ vinyl, Nge Huat Seng
Co. In transition room, Lam Chuan laminate on built-in shelving, Lam
Chuan Import-Export. In transition room, curtains are Acacia ‘Foremost’ Fibreguard, Fabrik Etc.