HS2 Phase 1 construction
Route sections
■ Euston-West Ruislip:
Skanska Costain Strabag Joint Venture, 16.4 miles.
■ West Ruislip-South Heath:
Align Joint Venture, 13.4 miles.
■ South Heath-Long Itchington: EKFB Joint Venture, 50 miles.
■ Long ItchingtonBirmingham/Handsacre Junction (WCML): Balfour Beatty Vinci, 56 miles.
Stations ■ Euston: Mace Dragados Joint Venture. ■ Old Oak Common: Balfour Beatty Vinci SYSTRA Joint Venture. ■ Interchange: Laing
O’Rourke. ■ Curzon Street: Mace Dragados Joint Venture.