Network Rail Improvement Works – major projects carried out during Christmas 2021
Birmingham New Street signalling upgrades. Wolverhampton platform extensions. Macclesfield signalling upgrades.
Telford platform extensions.
Flood protection works on WCML between Milton Keynes and Rugby.
Track replacement and remodelling at Leeds. Overhead line works at Leeds in connection with the remodelling.
Signalling upgrades between London Paddington and Slough.
Bridge replacement and culvert upgrades at Stroud.
Track replacement in and around Bristol Parkway. Installation of tactile paving on station platforms at Bristol Temple Mead.
Track and signalling upgrades and installation of sections of overhead line in and around
Manchester Victoria.
Tracklaying at Bletchley in connection with the East West Rail project.
Overhead line replacement at Stratford. Preparation works at London Liverpool Street for the station roof renewal and points replacement. Point replacement at Norwich.
Track replacement and bridge strengthening works at Camden.