Navigated
Rail Express
Rail Express

Rail Express Revista Suscripciones en Línea

o

¡Suscribirse a Select

15 ediciones de periódicos o revistas a tu elección cada mes

Consigue esta edición

Rail Express, 01 Noviembre 2026

¡Suscribirse a Rail Express

US $8,99/3 meses

Descripción

Rail Express revista está disponible para leer en línea con PressReader. Descarga el número actual para leer más tarde o navega por los números anteriores de Rail Express en el archivo.

En esta edición

ArticleA class-by-class round-up of this month’s inter­est­ing and unusual work­ings.

CLASS 20 The Loco­mot­ive Ser­vices’ Chair­man’s train tra­versed the East-West route on Septem­ber 4 top and tailed by pairs of EE Type 1s. Run­ning as the four coach 1Z06 11.01 Oxford-Bed­ford St Johns the train was powered by Nos. 20096+20107...

A class-by-class round-up of this month’s inter­est­ing and unusual work­ings.

ArticleFOUR DECADES AND STILL ELECTRIFYING

THE BR Class 91 was Bri­tain’s first true high-speed elec­tric loco­mot­ive, with an out­put of 6,480 hp (4,830kW) and a design top speed of 140 mph (225 km/h). Referred to as ‘Elec­tras’ by Brit­ish Rail, or more com­monly Inter­City 225s, the locos...

FOUR DECADES AND STILL ELECTRIFYING

ArticleHEADLINE NEWS

Trans­Pen­nine orders bat­tery elec­tric units, Chil­tern ren­ation­al­ised, Grand Cent­ral to take on stored Class 180s and could release 221s to EMR, New ser­vice to Manchester Air­port, DfT Rolling Stock strategy out­lined, Faulty AWS warn­ing...

HEADLINE NEWS

ArticleGB Rail­freight brings back diesel shunters at three loc­a­tions.

THE trac­tion demands of the autumn Rail­head Treat­ment Train cam­paign have forced GB Rail­freight to sus­pend the use of main line loco­mot­ives as ‘super shunters’ at both Bescot and White­moor and bring back ded­ic­ated pilots. Both loc­a­tions...

GB Rail­freight brings back diesel shunters at three loc­a­tions.

ArticlePlans to save a Class 58 are aban­doned.

PLANS to save No. 58048 for pre­ser­va­tion have had to be shelved fol­low­ing the with­drawal of the loco­mot­ive from sale. ‘Project 58048’ was set up by sev­eral indi­vidu­als, primar­ily from the Class 58 Loco­mot­ive Group, fol­low­ing...

Plans to save a Class 58 are aban­doned.

ArticleFinal Class 150/2 sets leave Neville Hill.

THE gradual exchange of Class 150/1 and 150/2 sets between New­ton Heath and Neville Hill depots was com­pleted dur­ing Septem­ber. The final moves took place on Septem­ber 13, when Nos. 150119/123 formed the 5Z51 11.09 New­ton Heath-Neville Hill, with...

Final Class 150/2 sets leave Neville Hill.